BLD-Aging Inspection | 10/30/2015 | 10/30/2015 | 11/3/2015 | | DONE |
Phil Shearer
|
|
|
|
Expired/Cancelled | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | DONE |
Phil Shearer
|
|
|
|
Routing Walk-In (Zoning) | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | DONE |
Darla L Downs
|
|
|
|
Routing Walk-In (Zoning) | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | PASS |
Josh Wilson
|
|
|
Ok with change: The accessory building cannot exceed size of primary structure. The building shall be reduced to 32' x 25' for a total of 800 sq. ft. JGW 9-12-11
|
Routing Walk-In (BLD) | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 9/12/2011 | 9/12/2011 | 9/12/2011 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 9/12/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2011 | | |
|
|
|
|
1st review completed | | | 9/12/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/12/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2011 | | DONE |
|
|
|
|
Application received | | 9/12/2011 | | | |
|
|
|
|