Third Notice | | 1/22/2012 | 1/26/2012 | | DONE |
|
|
|
done 1-26-12
|
Second Notice | | 1/13/2012 | 1/17/2012 | | DONE |
Christina Prado
|
|
|
mailed 1-18-2012
|
First Notice | 12/27/2011 | 12/27/2011 | 1/3/2012 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/23/2011 | 12/27/2011 | 12/27/2011 | A | PASS |
Tom Arcoraci
|
|
|
Robere Phone #: ###-####
|
DOC - Permit Finaled | 12/27/2011 | 12/27/2011 | 12/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/22/2011 | 12/23/2011 | 12/23/2011 | A | NR |
Tom Arcoraci
|
|
|
robere - please call 1/2 hr prior so he can meet you there Phone #: ###-#### needs plumbing sign off
|
Plan Reviewer's activity | | | 12/23/2011 | | DONE |
Tim L. Woodard
|
|
|
Changed permit to a vannilla finish because there is no tenant at this time.
|
Inspection Record Card- Bld | | | 12/23/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 12/20/2011 | | 12/22/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 12/22/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 12/22/2011 | | DONE |
Christina Prado
|
|
|
Called Robere and gave fees due
|
Override - Parcel Holds | | | 12/22/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 12/22/2011 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/22/2011 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
Routing - PLAN CHECK | 12/20/2011 | | 12/20/2011 | | PASS |
Tim L. Woodard
|
|
|
PLAN MODIFICATION 12-20-11 – Modification submitted to remove the high/low drinking fountain from this projects scope of work.**TLW**
|
Routing - PUBLIC WORKS | 12/20/2011 | | 12/20/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Case Summary (BLD) | | | 12/20/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Rating | 12/20/2011 | | 12/20/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plan Modification Accepted | | | 12/20/2011 | | |
|
|
|
Plan modification accepted for the removal of the high/low drinking fountains. 2 copies of sheet A1.01 were submitted with no chnage in value.
|
BLD-Framing/Rough-in | 10/20/2011 | 10/21/2011 | 10/21/2011 | A | PART |
Jim Storey
|
|
|
Please call prior to arrival///30min---ROBER Phone #: ###-#### need mech permit for ventalation/ ok to cover access will be open for insp of duct to exting roof jack.
|
Plan assigned to (TLW) | 9/13/2011 | | 9/29/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLANNING Land Div | 9/29/2011 | | 9/29/2011 | | PASS |
Todd Tucker
|
|
|
Had meeting with Todd, owner, and myself. The synobsis of that meeting can be found in the Plan Review Report. Propertyline was removed. TLW
|
Routing - PLAN CHECK | 9/29/2011 | | 9/29/2011 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 9/29/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/29/2011 | | DONE |
Barbara Stitt
|
|
|
Called and told him that permit is ready and fees due on 9-29-11 @ 1:50pm BAS
|
Issue PAID IN FULL permit | | | 9/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 9/16/2011 | | 9/21/2011 | | FAIL |
Tim L. Woodard
|
|
|
Openings on propertyline wall. Refer to plan review report. TLW
|
1st review completed | | | 9/21/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 9/15/2011 | | 9/16/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 9/15/2011 | | 9/15/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 9/13/2011 | 9/14/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/13/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/13/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 12/20/2011 | | | | |
|
|
|
|