First Notice | | 11/28/2011 | 12/5/2011 | | DONE |
|
|
|
|
BLD-Final | 11/17/2011 | 11/18/2011 | 11/18/2011 | A | PASS |
Jim Storey
|
|
|
Please call 30min prior for access---Justin Phone #: ###-####
|
Permanent Occupancy | | | 11/18/2011 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 11/16/2011 | 11/17/2011 | 11/17/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
FIRE-Final Inspection | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | CANC |
Forrest France
|
|
|
Justin Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 11/4/2011 | 11/4/2011 | 11/4/2011 | P | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler system modifications including spacing adjustment at a column.
|
BLD-Framing/Rough-in | 10/31/2011 | 11/1/2011 | 11/1/2011 | P | PASS |
Jim Storey
|
|
|
justin - ceiling inspection - please call 1/2 hr prior Phone #: ###-#### ceilling ok
|
BLD-Framing/Rough-in | 10/20/2011 | 10/20/2011 | 10/20/2011 | P | PASS |
Jim Storey
|
|
|
justin - please call 1/2 hr prior Phone #: ###-#### fire stopping ok at floor.
|
BLD-Framing/Rough-in | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | PASS |
Jim Storey
|
|
|
JUSTIN Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/5/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 9/15/2011 | | 10/4/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/19/2011 | | 10/4/2011 | | PASS |
Tim L. Woodard
|
|
|
With redlines and plan review report. TLW
|
1st review completed | | | 10/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/4/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 10/4/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/4/2011 | | DONE |
Tisha Gallop
|
|
|
called Steve Turney and left vm permit is ready and fees and verify if owner is GC or if other contractor need GC form.
|
Routing - PUBLIC WORKS | 9/15/2011 | | 9/19/2011 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | 9/13/2011 | 9/15/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/15/2011 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 9/15/2011 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/15/2011 | | DONE |
Tisha Gallop
|
|
|
|