BLD-Conference | 11/16/2015 | 11/16/2015 | 11/16/2015 | A | FAIL |
Tony Young
|
|
|
status,, need to expire
|
BLD-Framing/Rough-in | 10/21/2011 | 10/24/2011 | 11/8/2011 | P | DONE |
Tony Young
|
|
|
john Phone #: ###-####
|
BLD-Energy code compliance | 10/25/2011 | 10/26/2011 | 10/27/2011 | P | PASS |
Tony Young
|
|
|
john Phone #: ###-####
|
BLD-Framing/Rough-in | 10/24/2011 | 10/25/2011 | 10/25/2011 | P | PASS |
Tony Young
|
|
|
john Phone #: ###-####
|
BLD-Foundation | 9/26/2011 | 9/27/2011 | 9/27/2011 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Footing | 9/20/2011 | 9/21/2011 | 9/21/2011 | P | PASS |
Jim Storey
|
|
|
JOHN Phone #: ###-####
|
PubWorks Subgrade Approval | 9/21/2011 | 9/21/2011 | 9/21/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
OVERRIDE | | | 9/14/2011 | | |
|
|
|
|
Routing Walk-In (PW Hillside) | 9/14/2011 | 9/14/2011 | 9/14/2011 | A | PASS |
Terry Records
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
|
Routing Walk-In (Zoning) | 9/14/2011 | 9/14/2011 | 9/14/2011 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/14/2011 | 9/14/2011 | 9/14/2011 | A | PASS |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 9/14/2011 | 9/14/2011 | 9/14/2011 | | DONE |
Carl D Madsen
|
|
|
|
1st review completed | | | 9/14/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/14/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 9/14/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 9/14/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 9/14/2011 | | | |
|
|
|
|