PubWorks Occupancy Approval | 2/28/2013 | 2/28/2013 | 2/28/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved Landscape Encroachment Agreement from Homeowner and Builder. HOA approved encroachment and provided a written agreement for easment of landscaping features.
|
BLD-Final | 9/6/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 9/7/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/5/2012 | 9/6/2012 | 9/7/2012 | P | FAIL |
Dave Hannah
|
|
|
david Phone #: ###-#### c/n on site still needs hillside sign off by terry
|
BLD-Final | 8/30/2012 | 9/4/2012 | 9/4/2012 | P | CANC |
Dave Hannah
|
|
|
david Phone #: ###-####
|
Plan resubmittals received | | | 9/4/2012 | | DONE |
|
|
|
new acca report
|
Routing - MECHANICAL | 9/4/2012 | | 9/4/2012 | | PASS |
Troy James
|
|
|
resubmitted acca report
|
BLD-Energy code compliance | 4/17/2012 | 4/17/2012 | 4/23/2012 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 4/19/2012 | 4/20/2012 | 4/20/2012 | A | PASS |
Dave Hannah
|
|
|
DAVID Phone #: ###-#### shaer ok to cover ext
|
BLD-Framing/Rough-in | 4/17/2012 | 4/17/2012 | 4/20/2012 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-#### ext shear ok to cover ext
|
BLD-Framing/Rough-in | 4/5/2012 | 4/6/2012 | 4/6/2012 | A | PASS |
Jim Sly
|
|
|
david Phone #: ###-####
|
BLD-Foundation | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 12/14/2011 | 12/14/2011 | 12/14/2011 | P | PASS |
Dave Hannah
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 12/13/2011 | 12/14/2011 | 12/14/2011 | P | CANC |
Dave Hannah
|
|
|
bill Phone #: ###-####
|
BLD-Foundation | 12/12/2011 | 12/14/2011 | 12/14/2011 | A | CANC |
Dave Hannah
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 12/12/2011 | 12/13/2011 | 12/14/2011 | A | CANC |
Dave Hannah
|
|
|
bill Phone #: ###-####
|
PubWorks Subgrade Approval | 12/13/2011 | 12/13/2011 | 12/13/2011 | | DONE |
Terry Records
|
|
|
Subgrade for garage footings approved by the geotechnical engineer. 4 inches of loose material must be removed from the bottom of the footings
|
BLD-Foundation | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | DONE |
Dave Hannah
|
|
|
bill Phone #: ###-####
|
BLD-Foundation | 11/10/2011 | 11/10/2011 | 11/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
basement walls
|
BLD-Footing | 11/4/2011 | 11/7/2011 | 11/7/2011 | A | PART |
Dave Hannah
|
|
|
Bill Phone #: ###-#### lower basement
|
BLD-Footing | 10/31/2011 | 11/2/2011 | 11/2/2011 | A | PASS |
Dave Hannah
|
|
|
Garage code is 1968. Plans by furnace. Phone #: ###-#### >> Inspection requested via web by Tony Luchini
|
PubWorks Subgrade Approval | 10/28/2011 | 10/28/2011 | 10/28/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer.
|
Issue PAID IN FULL permit | | | 10/18/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 10/13/2011 | | 10/17/2011 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2011 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2011 | | DONE |
|
|
|
left vm for david - permit ready and fees given
|
Permit Ready to Issue | | | 10/17/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 10/13/2011 | | DONE |
|
|
|
put back in rev status as it has not passed mechanical
|
Routing - MECHANICAL | 10/13/2011 | | 10/13/2011 | | FAIL |
Troy James
|
|
|
designer did not get my previous comments, called designer and gave him the corrections
|
Plan assigned to (SRZ) | 9/30/2011 | 9/30/2011 | 10/12/2011 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 10/12/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 9/30/2011 | | 10/12/2011 | | PASS |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2011 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 9/22/2011 | 9/22/2011 | 9/30/2011 | | DEFR |
Carl D Madsen
|
|
|
Defferred to Sam Zahorka
|
1st review completed | | | 9/30/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - FIRE | 9/28/2011 | | 9/29/2011 | | PASS |
Scott Arellano
|
|
|
Fire sprinklers are required. Per Boulder Heights Estates subdivision plat note #19. "All homes in Boulder Heights Estates subdivision #1 must be equipped with an automatic fire sprinkler system installed in accordance with NFPA 13D."
|
Route to Impact Fee Review | 9/23/2011 | 9/28/2011 | 9/28/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | 9/27/2011 | | 9/28/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00681 plan approved with conditions attached to the permit.
|
Routing - MECHANICAL | 9/27/2011 | | 9/27/2011 | | FAIL |
Troy James
|
|
|
emailed corrections to geoff
|
Routing - PLANNING | 9/26/2011 | | 9/27/2011 | | PASS |
Susan Riggs
|
|
|
|
Routing - PUBLIC WORKS | 9/23/2011 | | 9/26/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 9/14/2011 | 9/23/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 9/23/2011 | | 9/23/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Grading-Hillside | | | 9/23/2011 | | PASS |
Terry Records
|
|
|
|
Intake Approval | | | 9/22/2011 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 9/14/2011 | | FAIL |
Tisha Gallop
|
|
|
|