Third Notice | | 1/17/2012 | 1/9/2012 | | DONE |
|
|
|
|
Third Notice | | 12/10/2011 | 1/3/2012 | | DONE |
|
|
|
faxed
|
Second Notice | | 12/1/2011 | 12/5/2011 | | DONE |
|
|
|
|
First Notice | 11/16/2011 | 11/16/2011 | 11/21/2011 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 11/14/2011 | 11/15/2011 | 11/16/2011 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
DOC - Permit Finaled | 11/16/2011 | 11/16/2011 | 11/16/2011 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/25/2011 | 10/25/2011 | 10/25/2011 | P | PASS |
Dave Hannah
|
|
|
bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | FAIL |
Dave Hannah
|
|
|
correction notice on site
|
BLD-Final | 10/10/2011 | 10/11/2011 | 10/11/2011 | A | NR |
Dave Hannah
|
|
|
dennis Phone #: ###-####
|
BLD-Footing | 9/26/2011 | 9/27/2011 | 9/27/2011 | A | PASS |
Dave Hannah
|
|
|
dusty Phone #: ###-####
|
Issue & PRINT to be Invoiced | | | 9/26/2011 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 9/23/2011 | | |
|
|
|
|
Plan assigned to (DRS) | 9/19/2011 | 9/19/2011 | 9/23/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 9/22/2011 | | 9/23/2011 | | PASS |
Dan Stuart
|
|
|
Dan Stuart
18" x 24" copies of sheets A1, A2, A3 & A4 received and inserted into plans. Rotuing to permit desk to issue.
|
Plan resubmittals received | | | 9/23/2011 | | DONE |
|
|
|
Brian Jorgensen, Forestry, brought in 2 copies of Plan Sheets A1, A2, A3, A4 on 18" x 24" sheets.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2011 | | PASS |
Dan Stuart
|
|
|
|
Print Occupancy Form | | | 9/23/2011 | | DONE |
|
|
|
|
Telephone call | | | 9/23/2011 | | DONE |
Christina Prado
|
|
|
Called Brian to tell permit is ready
|
Permit Ready to Issue | | | 9/23/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 9/21/2011 | | 9/22/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00673 plan approved with conditions attached to the permit.
|
Route to Impact Fee Review | 9/19/2011 | 9/22/2011 | 9/21/2011 | | PASS |
Cindy M. Gould
|
|
|
Replacement of existing storage shed no impact fees
|
Routing - PUBLIC WORKS | 9/20/2011 | | 9/21/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 9/21/2011 | | 9/21/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 9/21/2011 | | 9/21/2011 | | CANC |
Joshua Johnson
|
|
|
Talked with Josh Johnson. Since the scope of work is replacing an existing shed with a new shed of the same size in the same location, Josh says he does not need to review and not to route to Planning. drs
|
Routing - PLANNING Land Div | 9/19/2011 | | 9/20/2011 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 9/20/2011 | | 9/20/2011 | | PASS |
Scott Arellano
|
|
|
Reviewed aerial view of site for distance to existing fire hydrant with Scott Arellano. The nearest hydrant for access is at Lewis & Pierce Streets. The distance scaled out at 384", < 400' max. This is all fire code analyst reviews for "U" occupancies. Approved by Scott.
|
Application received | | 9/19/2011 | 9/19/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 9/19/2011 | | PASS |
Dan Stuart
|
|
|
|