Case Summary (BLD) | | | 7/22/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/10/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/17/2011 | 10/17/2011 | 10/17/2011 | P | PASS |
Forrest France
|
|
|
Life safety passed.
|
BLD-Final | 10/12/2011 | 10/13/2011 | 10/14/2011 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by rich prasch
|
FIRE-Final Inspection | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | FAIL |
Troy Cobbley
|
|
|
No approved plans on site. No inspection was performed.
|
BLD-Wall Bracing | 10/7/2011 | 10/10/2011 | 10/11/2011 | P | PART |
Tony Young
|
|
|
Jimmy Phone #: ###-####,, wall connection ok per plans
|
BLD-Footing | 10/7/2011 | 10/10/2011 | 10/11/2011 | P | PASS |
Tony Young
|
|
|
Jimmy Phone #: ###-####
|
Route to Impact Fee Review | 9/26/2011 | 9/29/2011 | 10/7/2011 | | PASS |
Cindy M. Gould
|
|
|
No impact fees
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2011 | | PASS |
Dan Stuart
|
|
|
Plans to permit desk to issue permit.
|
Inspection Record Card- Bld | | | 10/7/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/7/2011 | | DONE |
Tisha Gallop
|
|
|
called Rich and told him permit is ready he said already knew the fees due.
|
Issue PAID IN FULL permit | | | 10/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (DRS) | 9/26/2011 | | 10/7/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - FIRE | 10/5/2011 | | 10/6/2011 | | PASS |
Scott Arellano
|
|
|
This non-combustible canopy is not required to sprinklered. (NFPA 13 - 8.15.7.2)
|
Routing - PLAN CHECK | 9/26/2011 | | 10/5/2011 | | PASS |
Dan Stuart
|
|
|
Routing to fire code analyst for review.
|
Telephone call | | | 10/5/2011 | | DONE |
|
|
|
Call to Carl Putman, P.E. to review anchor requirements for masonry attachment. Provided reference to ESR-1396, Simpson Strong-Tie "Wedge All Anchors or ESR-1678, Powers Fasteners, Wedge Bolt+ Screw Anchor for attachment. Stressed nedd to be galvanized or stainless stell anchors due to exterio exposure.
|
Telephone call | | | 10/4/2011 | | DONE |
|
|
|
Call to Rich Prasch to review 8-1/2" x 11" engineering details and verfiy which of the specific details were applicable for this project.
|
Routing - PLANNING | 10/3/2011 | | 10/3/2011 | | PASS |
Andrea Tuning
|
|
|
|
Pending Assignment by JCB | 9/23/2011 | | 9/26/2011 | | DONE |
Jason Blais
|
|
|
|
Routing - Design Review | 9/26/2011 | | 9/26/2011 | | FAIL |
Andrea Tuning
|
|
|
The applicant did not provide a site plan wtih the building documents that would allow me to confirm that all of the setbacks have been met. Andrea Tuning - CZC11-00201
|
Routing - Erosion and Sediment | 9/26/2011 | | 9/26/2011 | | CANC |
Clint A Smith
|
|
|
ESC Permit not REQUIRED DUE TO THE SIZE AND LOCATION.
|
Application received | | 9/21/2011 | 9/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 9/23/2011 | | PASS |
Tim L. Woodard
|
|
|
|