First Notice | 12/10/2012 | 12/10/2012 | 1/3/2013 | | DONE |
Jim Sly
|
|
|
faxed to Dave Evans Const
|
BLD-Final | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-#### CofC issued.
|
DOC - Permit Finaled | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dave Bashista Need Mech. final. Then issue Cert of Completion.
|
FIRE-Final Inspection | 12/6/2012 | 12/7/2012 | 12/7/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | FAIL |
Troy Cobbley
|
|
|
Need the door hardware installed for single action verification and the address installed
|
Zoning Approval | 12/5/2012 | 12/5/2012 | 12/5/2012 | | PASS |
Josh Wilson
|
|
|
|
BLD-Energy code compliance | 10/26/2012 | 10/26/2012 | 10/26/2012 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Jim Sly
|
|
|
dave Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/1/2012 | | DONE |
Tisha Gallop
|
|
|
check for plan mod fees mailed in. e-mailed receipt to Dave Evans Construction/Robert Powell. They already have approved plans per Project Dox case.
|
Telephone call | | | 9/27/2012 | | DONE |
Barbara Stitt
|
|
|
Spoke with Stephanie on 9-27-12 @ 10:40am w/Dave Evans Construction and she is mailing the fees in today//BAS
|
Routing - PLAN CHECK | 9/24/2012 | | 9/24/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2012 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 9/24/2012 | | DONE |
Barbara Stitt
|
|
|
Email sent to Dave Evans Contruction to inform them Plan Mod fees need paid before Batch Stamp can be completed on 9-24-12 @ 4:05pm//BAS
|
BLD-Framing/Rough-in | 4/27/2012 | 4/27/2012 | 4/29/2012 | P | CANC |
Jim Sly
|
|
|
Dave phone NR
|
BLD-Framing/Rough-in | 4/26/2012 | 4/26/2012 | 4/27/2012 | P | NR |
Jim Sly
|
|
|
DAVE Phone #: ###-#### Need Plumb R/I insp.
|
BLD-Framing/Rough-in | 4/20/2012 | 4/23/2012 | 4/23/2012 | A | NR |
Jim Sly
|
|
|
Dave Phone #: ###-#### Need plans and verify Plumb insp.
|
Permit Ready to Issue | | | 3/29/2012 | | DONE |
Tisha Gallop
|
|
|
Plan mod ready
|
Telephone call | | | 3/29/2012 | | DONE |
Tisha Gallop
|
|
|
called Rob Powell and told him plan mod is ready and fees.
|
CHANGE STATUS TO (ISS) | | | 3/29/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 3/29/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 3/21/2012 | 3/21/2012 | 3/28/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 3/26/2012 | | 3/28/2012 | | PASS |
Josh Wilson
|
|
|
Plan modification. OK per DRH11-00138.
|
Routing - PLAN CHECK | 3/28/2012 | | 3/28/2012 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 3/28/2012 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2012 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 3/28/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/21/2012 | | 3/26/2012 | | PASS |
Sam Zahorka
|
|
|
|
Plan Modification Accepted | | | 3/21/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld11-02358 (Kerr Bldg Vanilla TI) to remove office walls and revise the lighting plan to allow for an open office setting as well as a more flexible space plan for any future tenants; submitted on plan sheets A2.0, A9.0, and revised cert of value; routed to Sam Zahorka.
|
Issue PAID IN FULL permit | | | 11/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2011 | | DONE |
Rita DeYoung
|
|
|
|
Permit Ready to Issue | | | 11/2/2011 | | DONE |
Rita DeYoung
|
|
|
|
Telephone call | | | 11/2/2011 | | DONE |
Rita DeYoung
|
|
|
contacted Scott at Dave Evans Const.
|
Plan assigned to (SRZ) | 10/12/2011 | 10/12/2011 | 10/31/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/12/2011 | | 10/31/2011 | | PASS |
Sam Zahorka
|
|
|
E-Plan review
|
Routing - FIRE | | | 10/31/2011 | | PASS |
Sam Zahorka
|
|
|
"To be verified in the field"
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2011 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 10/28/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Addressing | 10/12/2011 | | 10/14/2011 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Rating | 10/12/2011 | | 10/12/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2011 | | 10/12/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 9/29/2011 | | | |
|
|
|
|