Second Notice | | 10/25/2012 | 10/16/2012 | | DONE |
|
|
|
|
First Notice | | 9/29/2012 | 10/15/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 8/10/2012 | 8/10/2012 | 8/13/2012 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/1/2012 | 6/4/2012 | 6/4/2012 | A | PASS |
Dave Hannah
|
|
|
Craig-Please call 45 mins prior to inspection Phone #: ###-#### ok for perm occ
|
Temporary Occupancy | 6/1/2012 | 8/30/2012 | 6/1/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 5/3/2012 | 5/3/2012 | 5/4/2012 | P | PART |
Dave Hannah
|
|
|
Craig Phone #: ###-#### ok for prem occ after I get spec inspection final letter
|
FIRE-Final Inspection | 5/1/2012 | 5/2/2012 | 5/2/2012 | A | PASS |
Forrest France
|
|
|
Life safety inspection completed satisfactory.
|
BLD-Framing/Rough-in | 3/22/2012 | 3/23/2012 | 3/23/2012 | A | PASS |
Dave Hannah
|
|
|
craig please call for access Phone #: ###-#### veiwing area framing
|
BLD-Conference | 3/9/2012 | 3/13/2012 | 3/13/2012 | A | PASS |
Dave Hannah
|
|
|
craig Phone #: ###-####
|
BLD-Conference | 3/8/2012 | 3/9/2012 | 3/9/2012 | A | DEFR |
Tom Arcoraci
|
|
|
craig Phone #: ###-####
|
BLD-Conference | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | DONE |
Dave Hannah
|
|
|
Craig-Please call at least 30 mins prior to inspection Phone #: ###-####
|
BLD-Footing | 1/27/2012 | 1/27/2012 | 1/30/2012 | P | DONE |
Dave Hannah
|
|
|
Craig Phone #: ###-#### spec inspector on site
|
BLD-Framing/Rough-in | 1/13/2012 | 1/17/2012 | 1/17/2012 | A | PASS |
Dave Hannah
|
|
|
Craig Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/9/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 10/3/2011 | 10/3/2011 | 11/1/2011 | | PASS |
Sam Zahorka
|
|
|
1st review completed. Pending ESC and Fire.
|
Routing - Erosion and Sediment | 10/31/2011 | | 11/1/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00709 plan approved with conditions attached to the permit.
|
Routing - PLAN CHECK | 11/1/2011 | | 11/1/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2011 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2011 | | DONE |
|
|
|
|
Telephone call | | | 11/1/2011 | | DONE |
|
|
|
11-1-11 called Andrew left message permit ready and fee given ///dld
|
1st review completed | | | 10/31/2011 | | FAIL |
|
|
|
Failed Erosion & Soil Control
|
Routing - PLAN CHECK | 10/31/2011 | | 10/31/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - FIRE | 10/27/2011 | | 10/31/2011 | | PASS |
Scott Arellano
|
|
|
Plans are approved. No seperate comments attached to plans.
|
Case Summary (BLD) | | | 10/27/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/13/2011 | | 10/27/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 10/12/2011 | | 10/13/2011 | | PASS |
Cody Riddle
|
|
|
|
Plan resubmittals received | | | 10/13/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of ESC Narratives and transmittal letter. Given to Sam
|
Routing - PLUMBING | 10/10/2011 | | 10/12/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Routing Off Site - STRUCTURAL | 10/3/2011 | | 10/11/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | 10/7/2011 | | 10/10/2011 | | FAIL |
Clint A Smith
|
|
|
ESC11-00709 plan failed due to not providing a narrative with the plan map. Contacted the applicant and explained the requirements.
|
Routing PW Drainage | 10/4/2011 | | 10/7/2011 | | PASS |
Brian Murphy
|
|
|
LESS THAN 500 SQ FT
|
Routing - PUBLIC WORKS | 10/3/2011 | | 10/7/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 10/3/2011 | 10/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 10/3/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Telephone call | | | 10/3/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING Land Div | 10/3/2011 | | 10/3/2011 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Recd Pcfee & Taken To Pln CK | | | 10/3/2011 | | DONE |
Tisha Gallop
|
|
|
|