BLD-Final | 11/8/2011 | 11/8/2011 | 11/8/2011 | P | PART |
Jim Sly
|
|
|
steve Phone #: ###-#### C/N.....Structure is complete and approved for final .....but, need hard surfaced driveway as per plan.
|
BLD-Footing | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | PASS |
Jim Sly
|
|
|
after 9am//Steve Phone #: ###-####
|
OVERRIDE | | | 10/12/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/12/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 10/12/2011 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/11/2011 | 10/11/2011 | 10/11/2011 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | PASS |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 10/11/2011 | 10/11/2011 | 10/11/2011 | | DONE |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/11/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/11/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/11/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2011 | | |
|
|
|
|
Application received | | 10/11/2011 | | | |
|
|
|
|