Print Statement | | | 3/20/2012 | | DONE |
Rita DeYoung
|
|
|
|
Second Notice | | 2/26/2012 | 3/1/2012 | | DONE |
|
|
|
|
First Notice | | 2/18/2012 | 2/16/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 2/7/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Final | 2/6/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Jim Storey
|
|
|
JOHN Phone #: ###-####
|
DOC - Permit Finaled | 2/7/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 2/7/2012 | 2/7/2012 | 2/7/2012 | | DONE |
Joshua Johnson
|
|
|
|
BLD-Final | 2/6/2012 | 2/6/2012 | 2/6/2012 | P | NR |
Jim Storey
|
|
|
JOHN Phone #: ###-####
|
FIRE-Conference | 1/27/2012 | 1/30/2012 | 1/30/2012 | A | DONE |
Troy Cobbley
|
|
|
On site visit with contractor regarding fire code review note items and project finish schedule.
|
FIRE-Conference | 1/3/2012 | 1/3/2012 | 1/24/2012 | P | DONE |
Forrest France
|
|
|
|
BLD-Other | 1/19/2012 | 1/20/2012 | 1/20/2012 | P | DONE |
Tom Arcoraci
|
|
|
John-above cieling inspection please Phone #: ###-####
|
BLD-Other | 1/19/2012 | 1/20/2012 | 1/20/2012 | A | PASS |
Tom Arcoraci
|
|
|
john - ceiling grid - as early as possible please Phone #: ###-#### ok pending elec inspection
|
FIRE-Conference | 1/12/2012 | 1/12/2012 | 1/12/2012 | P | DONE |
Forrest France
|
|
|
Regarding fire code review note items.
|
FIRE-Conference | 1/10/2012 | 1/10/2012 | 1/11/2012 | P | DONE |
Forrest France
|
|
|
On site visit regarding manual pull box locations for activation of the hood suppression systems per IFC requirements.
|
BLD-Framing/Rough-in | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PASS |
Jim Storey
|
|
|
john - first thing in the morning if possible, please Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2011 | 12/7/2011 | 12/7/2011 | A | PASS |
Jim Storey
|
|
|
soffits
|
BLD-Framing/Rough-in | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | FAIL |
Jim Storey
|
|
|
tighten up conections.
|
Issue PAID IN FULL permit | | | 11/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 10/24/2011 | | 11/28/2011 | | PASS |
Clint A Smith
|
|
|
reference ESC11-00749
|
Print Occupancy Form | | | 11/28/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/28/2011 | | DONE |
|
|
|
|
Telephone call | | | 11/28/2011 | | DONE |
|
|
|
11-28-11 called left message permit ready and fee given ///dld
|
Routing - PLAN CHECK | 11/22/2011 | | 11/26/2011 | | PASS |
Dan Stuart
|
|
|
Inserted resubmittals, red-lined plan sheets as necessary and modified plan review report. To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2011 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 10/21/2011 | | 11/26/2011 | | PASS |
Dan Stuart
|
|
|
|
Plan resubmittals received | | | 11/22/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of response from Architect, response from electrical engineer, ES Report, Project Start up for Special Inspections, and plan sheets A001, A810, A820; put on Dan Stuarts desk.
|
Routing - PLAN CHECK | 11/15/2011 | | 11/19/2011 | | FAIL |
Dan Stuart
|
|
|
Resubmittals of 11/18/11 inserted into plans and reviewed. There are 2 remaining items to be addressed. 1) Special Inspection for Hilti HUS Screw Anchor proposed for use and the Electrical Light fixture schedule, electrical comcheck and the fixtures indicated on Sheet E2.0L vs the comcheck cert sheet.
Copy of 2nd review e-mailed to architect.
|
Plan resubmittals requested | | | 11/19/2011 | | DONE |
|
|
|
Copy of 2nd plan review e-mailed to architect.
|
Plan resubmittals received | | | 11/18/2011 | | |
|
|
|
11-18-11 received 1 plan review report,1 response,1 electrical response, 1 wood screw reference,1 technical guide,& 2 copies of sheetsA001,A200,A201,A310,A500,A710,A810,A820,E3.1,E3.2,M3.0,P1.0,P2.1 sent to Dan S.
|
Plan Reviewer's activity | | | 11/17/2011 | | DONE |
|
|
|
Issued separate no-strucutral interior demo permit, BLD11-02770.
|
Routing - FIRE | 11/14/2011 | | 11/15/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 11/15/2011 | | FAIL |
|
|
|
Failed Public Works,Planning, Plan Check
|
Routing - PLAN CHECK | 10/31/2011 | | 11/14/2011 | | FAIL |
Dan Stuart
|
|
|
Resubmittals are required. Copy of plan review report e-mailed to architect. Plans routed to fire code analyst for review.
|
Routing - PLANNING | 10/31/2011 | | 10/31/2011 | | PASS |
Joshua Johnson
|
|
|
|
Routing - PLANNING | 10/29/2011 | | 10/31/2011 | | PASS |
Joshua Johnson
|
|
|
10/28/11 - New Sheets L2.1, L3.1 & L6.1 and cross access agreement.
|
Routing PW Environmental | 10/27/2011 | | 10/28/2011 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/28/2011 | | 10/28/2011 | | PASS |
Connie Baumgartner
|
|
|
Resubmittals plan sheet P2.0. Routing back to PW per request by CLB.
|
Plan resubmittals received | | | 10/28/2011 | | DONE |
Tisha Gallop
|
|
|
received transmittal, Declaration of Restrictions and Grant Easements, and two copies of plan sheets L2.1, L3.1, L6.1; taken to Dan Stuart
|
Routing - PLAN CHECK | 10/25/2011 | | 10/28/2011 | | PEND |
Dan Stuart
|
|
|
Resubmittals received for PW and Planning. Plans routed to PW and then to Planning for re-review.
|
Plan resubmittals received | | | 10/27/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of plans marked P2.0. Given to Dan Stuart for review
|
Routing - PLUMBING | 10/25/2011 | | 10/25/2011 | | PASS |
Bill VanDegrift
|
|
|
May need backflow protection on rooftop evaporative cooler supply.
Per plans and 2003 UPC.
|
Routing - PLANNING | 10/25/2011 | | 10/25/2011 | | FAIL |
Joshua Johnson
|
|
|
Landscape does not show row of landscape trees as required by CUP11-00066
|
Routing PW Sewer Rating | 10/24/2011 | | 10/24/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 10/24/2011 | | 10/24/2011 | | FAIL |
Walt Baumgartner
|
|
|
Contacted engineer of record for resubmittal of corrected plumbing sheet.
|
Routing - PUBLIC WORKS | 10/24/2011 | | 10/24/2011 | | FAIL |
Connie Baumgartner
|
|
|
Routed to Plumbing review
|
Routing - Addressing | 10/21/2011 | | 10/24/2011 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 10/19/2011 | | 10/21/2011 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 10/21/2011 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
|
Application received | | 10/11/2011 | 10/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 10/19/2011 | | DONE |
Tisha Gallop
|
|
|
received revised certificate of value to break out permit for grading & drainage (Bld11-02530).
|
Intake Approval | | | 10/18/2011 | | PASS |
Dan Stuart
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 10/11/2011 | | FAIL |
Sam Zahorka
|
|
|
See the plan intake checklist attached under documents.
|