Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD11-02456
StatusFinaled
Name COMAN COLLECTION INC
Site Address 604 E CLUBVIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 4,050 sq. ft., 3 story (basement 1,355 sq. ft., grade level 1,560 sq. ft.,1st story above grade 1,135 sq. ft.) with 5 bedrooms, 5 1/2 bathrooms, approximately 442 sq. ft. of covered patio/porch and a 980 sq. ft. attached garage per the approved plans, plan review report, attached engineering and any notations. This structure is located in WUI zone A and requires a class A roofing material, noncombustible exterior siding products and one hour fire rated soffits. R-1B zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/2/20128/3/20128/3/2012APASS
DetailsJim Storey
GREG Phone #: ###-####
DOC - Permit Finaled8/3/20128/3/20128/3/2012PPASS
DetailsJim Storey
BLD-Grading Inspection8/2/20128/2/20128/2/2012PDONE
DetailsTerry Records
Final grading and drainage approved
BLD-Conference3/6/20123/6/20123/6/2012PPASS
DetailsTony Young
Greg also a framing rough inspection please Phone #: ###-####,, correction made ok
BLD-Energy code compliance3/2/20123/5/20123/6/2012APASS
DetailsTony Young
Greg also a framing rough inspection please Phone #: ###-####
BLD-Energy code compliance3/5/20123/6/20123/6/2012APART
DetailsTony Young
Greg also a framing rough inspection please Phone #: ###-####,, needs a conf.. some missed in rim area,, needs some fireblocking still
BLD-Framing/Rough-in2/24/20122/27/20122/27/2012APART
DetailsTony Young
Greg Phone #: ###-####,, correction notice posted,, ok to insulate
Plan resubmittals received  2/14/2012 DONE
new manual j report
Routing - MECHANICAL2/14/2012 2/14/2012 PASS
DetailsTroy James
resubmitted new manual j report
BLD-Framing/Rough-in2/7/20122/7/20122/8/2012PPART
DetailsTony Young
greg Phone #: ###-####,, exterior shear
BLD-Framing/Rough-in2/6/20122/7/20122/7/2012APART
DetailsTony Young
greg Phone #: ###-####,, exterior shear ok after fixing 2 areas,, marked on plans
BLD-Wall cover1/30/20121/30/20121/30/2012PFAIL
DetailsTony Young
Sheer wall --- Greg Phone #: ###-####,, c/n posted
BLD-Foundation12/8/201112/8/201112/9/2011PPART
DetailsTony Young
BLD-Footing12/5/201112/6/201112/6/2011APASS
DetailsTony Young
cal Phone #: ###-####
PubWorks Subgrade Approval12/6/201112/6/201112/6/2011 DONE
DetailsTerry Records
Footing subgrade approved by the geotechnical engineer
BLD-Footing12/5/201112/5/201112/5/2011PNR
DetailsTony Young
cal Phone #: ###-####,, needs soil report
BLD-Footing12/2/201112/5/201112/5/2011ANR
DetailsTony Young
cal Phone #: ###-####
BLD-Foundation11/18/201111/18/201111/18/2011PPART
DetailsTony Young
cal Phone #: ###-####,,, basement walls ok
BLD-Foundation11/18/201111/18/201111/18/2011APASS
DetailsTony Young
cal Phone #: ###-####,, basement walls ok
BLD-Footing11/14/201111/15/201111/15/2011APART
DetailsTony Young
cal Phone #: ###-####,, basement footings ok,, setbacks appear ok
PubWorks Subgrade Approval11/14/201111/14/201111/14/2011 DONE
DetailsTerry Records
Issue PAID IN FULL permit  11/4/2011 DONE
DetailsChristina Prado
Route to Impact Fee Review10/11/201110/14/201111/3/2011 PASS
DetailsCindy M. Gould
Plan assigned to (CDM)10/11/201110/11/201111/3/2011 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/20/2011 11/3/2011 PASS
DetailsCarl D Madsen
Routing - PLANNING11/3/2011 11/3/2011 PASS
DetailsSusan Riggs
Case Summary (BLD)  11/3/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/3/2011  
Inspection Record Card- Bld  11/3/2011 DONE
Permit Ready to Issue  11/3/2011  
Telephone call  11/3/2011 DONE
11-3-11 called Greg permit ready and fee given ///dld
1st review completed  11/2/2011 FAIL
Routing - PLAN CHECK  11/2/2011 FAIL
DetailsCarl D Madsen
Glass guard rail engineering is required and WUI zone requirements for siding materials. Sent E-Mail to Greg Coman 11-2-11 CDM
Plan resubmittals received  10/21/2011  
Received 2 copies of sheet A1.1 and 1 copy of a1.1 on 8 1/2x11 and taken to Carl Madsen
Routing - MECHANICAL10/19/2011 10/20/2011 PASS
DetailsTroy James
Routing - MECHANICAL10/12/2011 10/19/2011 FAIL
DetailsTroy James
sent corrections to designer
Plan resubmittals received  10/18/2011  
Received 2 copies of sheets A1.1, GRD, SWPPP, and 2 copies of 8 1/2 x 11 copy of A1.1 inserted into plans and returned to fire
Routing - FIRE10/17/2011 10/18/2011 PASS
DetailsScott Arellano
No fire sprinkler requirement on lot #51.
Routing - Erosion and Sediment10/17/2011 10/17/2011 PASS
DetailsClint A Smith
ESC11-00731 plan approved with conditions attached to the permit.
Routing - PUBLIC WORKS10/12/2011 10/12/2011 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside10/12/2011 10/12/2011 PASS
DetailsTerry Records
Routing - PLANNING10/12/2011 10/12/2011 FAIL
DetailsSusan Riggs
I called Greg Coman and informed him that a portion of the garage and driveway extend into the 25' ACHD stromdrain easement. Suggested he get permission from ACHD to encroach 4' into the easement, or relocated the building outside of the easement. He said he will call the architect and get back to me.
Routing - Addressing10/11/2011 10/12/2011 PASS
DetailsTerry Records
Application received 10/11/201110/11/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  10/11/2011 DONE
DetailsBarbara Stitt
Intake Approval  10/11/2011 PASS
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  10/11/2011 DONE
DetailsBarbara Stitt