BLD-Final | 8/2/2012 | 8/3/2012 | 8/3/2012 | A | PASS |
Jim Storey
|
|
|
GREG Phone #: ###-####
|
DOC - Permit Finaled | 8/3/2012 | 8/3/2012 | 8/3/2012 | P | PASS |
Jim Storey
|
|
|
|
BLD-Grading Inspection | 8/2/2012 | 8/2/2012 | 8/2/2012 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Conference | 3/6/2012 | 3/6/2012 | 3/6/2012 | P | PASS |
Tony Young
|
|
|
Greg also a framing rough inspection please Phone #: ###-####,, correction made ok
|
BLD-Energy code compliance | 3/2/2012 | 3/5/2012 | 3/6/2012 | A | PASS |
Tony Young
|
|
|
Greg also a framing rough inspection please Phone #: ###-####
|
BLD-Energy code compliance | 3/5/2012 | 3/6/2012 | 3/6/2012 | A | PART |
Tony Young
|
|
|
Greg also a framing rough inspection please Phone #: ###-####,, needs a conf.. some missed in rim area,, needs some fireblocking still
|
BLD-Framing/Rough-in | 2/24/2012 | 2/27/2012 | 2/27/2012 | A | PART |
Tony Young
|
|
|
Greg Phone #: ###-####,, correction notice posted,, ok to insulate
|
Plan resubmittals received | | | 2/14/2012 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/14/2012 | | 2/14/2012 | | PASS |
Troy James
|
|
|
resubmitted new manual j report
|
BLD-Framing/Rough-in | 2/7/2012 | 2/7/2012 | 2/8/2012 | P | PART |
Tony Young
|
|
|
greg Phone #: ###-####,, exterior shear
|
BLD-Framing/Rough-in | 2/6/2012 | 2/7/2012 | 2/7/2012 | A | PART |
Tony Young
|
|
|
greg Phone #: ###-####,, exterior shear ok after fixing 2 areas,, marked on plans
|
BLD-Wall cover | 1/30/2012 | 1/30/2012 | 1/30/2012 | P | FAIL |
Tony Young
|
|
|
Sheer wall --- Greg Phone #: ###-####,, c/n posted
|
BLD-Foundation | 12/8/2011 | 12/8/2011 | 12/9/2011 | P | PART |
Tony Young
|
|
|
|
BLD-Footing | 12/5/2011 | 12/6/2011 | 12/6/2011 | A | PASS |
Tony Young
|
|
|
cal Phone #: ###-####
|
PubWorks Subgrade Approval | 12/6/2011 | 12/6/2011 | 12/6/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 12/5/2011 | 12/5/2011 | 12/5/2011 | P | NR |
Tony Young
|
|
|
cal Phone #: ###-####,, needs soil report
|
BLD-Footing | 12/2/2011 | 12/5/2011 | 12/5/2011 | A | NR |
Tony Young
|
|
|
cal Phone #: ###-####
|
BLD-Foundation | 11/18/2011 | 11/18/2011 | 11/18/2011 | P | PART |
Tony Young
|
|
|
cal Phone #: ###-####,,, basement walls ok
|
BLD-Foundation | 11/18/2011 | 11/18/2011 | 11/18/2011 | A | PASS |
Tony Young
|
|
|
cal Phone #: ###-####,, basement walls ok
|
BLD-Footing | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | PART |
Tony Young
|
|
|
cal Phone #: ###-####,, basement footings ok,, setbacks appear ok
|
PubWorks Subgrade Approval | 11/14/2011 | 11/14/2011 | 11/14/2011 | | DONE |
Terry Records
|
|
|
|
Issue PAID IN FULL permit | | | 11/4/2011 | | DONE |
Christina Prado
|
|
|
|
Route to Impact Fee Review | 10/11/2011 | 10/14/2011 | 11/3/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (CDM) | 10/11/2011 | 10/11/2011 | 11/3/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/20/2011 | | 11/3/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 11/3/2011 | | 11/3/2011 | | PASS |
Susan Riggs
|
|
|
|
Case Summary (BLD) | | | 11/3/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/3/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2011 | | |
|
|
|
|
Telephone call | | | 11/3/2011 | | DONE |
|
|
|
11-3-11 called Greg permit ready and fee given ///dld
|
1st review completed | | | 11/2/2011 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | | | 11/2/2011 | | FAIL |
Carl D Madsen
|
|
|
Glass guard rail engineering is required and WUI zone requirements for siding materials. Sent E-Mail to Greg Coman 11-2-11 CDM
|
Plan resubmittals received | | | 10/21/2011 | | |
|
|
|
Received 2 copies of sheet A1.1 and 1 copy of a1.1 on 8 1/2x11 and taken to Carl Madsen
|
Routing - MECHANICAL | 10/19/2011 | | 10/20/2011 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 10/12/2011 | | 10/19/2011 | | FAIL |
Troy James
|
|
|
sent corrections to designer
|
Plan resubmittals received | | | 10/18/2011 | | |
|
|
|
Received 2 copies of sheets A1.1, GRD, SWPPP, and 2 copies of 8 1/2 x 11 copy of A1.1 inserted into plans and returned to fire
|
Routing - FIRE | 10/17/2011 | | 10/18/2011 | | PASS |
Scott Arellano
|
|
|
No fire sprinkler requirement on lot #51.
|
Routing - Erosion and Sediment | 10/17/2011 | | 10/17/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00731 plan approved with conditions attached to the permit.
|
Routing - PUBLIC WORKS | 10/12/2011 | | 10/12/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 10/12/2011 | | 10/12/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING | 10/12/2011 | | 10/12/2011 | | FAIL |
Susan Riggs
|
|
|
I called Greg Coman and informed him that a portion of the garage and driveway extend into the 25' ACHD stromdrain easement. Suggested he get permission from ACHD to encroach 4' into the easement, or relocated the building outside of the easement. He said he will call the architect and get back to me.
|
Routing - Addressing | 10/11/2011 | | 10/12/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 10/11/2011 | 10/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 10/11/2011 | | PASS |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/11/2011 | | DONE |
Barbara Stitt
|
|
|
|