Second Notice | | 9/29/2012 | 10/15/2012 | | DONE |
|
|
|
|
First Notice | | 8/26/2012 | 9/19/2012 | | DONE |
|
|
|
|
BLD-Final | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. ok for perm occ.
|
Permanent Occupancy | | | 8/16/2012 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 8/14/2012 | 8/14/2012 | 8/14/2012 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 8/2/2012 | 8/2/2012 | 8/3/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 7/25/2012 | 7/25/2012 | 7/25/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide address, remove the exit sign as discussed and provide revised building plans showing the fence/storage area on the west side of the building.
|
PubWorks Occupancy Approval | 7/24/2012 | 7/24/2012 | 7/24/2012 | | DONE |
Tiffany Lowery
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/20/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 6/4/2012 | 6/4/2012 | 6/12/2012 | | PASS |
Carl Westfall
|
|
|
westside mechanical - plan mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/12/2012 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2012 | | DONE |
Christina Prado
|
|
|
Called Dale to advise permit is ready and fees are due
|
Permit Ready to Issue | | | 6/12/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 6/5/2012 | | 6/12/2012 | | PASS |
Carl Westfall
|
|
|
Plan modification approved. The shower is NOT approved and is required to be removed in its entirety.
|
Plan resubmittals received | | | 6/8/2012 | | DONE |
Tisha Gallop
|
|
|
received three copies of plan sheet A-2R; taken to Carl Westfall.
|
Routing - PLAN CHECK | 6/4/2012 | | 6/5/2012 | | FAIL |
Carl Westfall
|
|
|
Sent an E-mail to Dale Binning.
Dale,
I have been working on the plan modification that you submitted yesterday for the above referenced project and have the following comments:
1) A cane skirt or some other cane detection element will be required at the "high" drinking fountain.
2) A service sink is still required and it has been deleted from the drawings. Please revise the drawings to maintain the service sink.
3) The shower is required to be accessible to the disabled. Please revise the drawings to show the shower fully accessible to the disabled. Provide fully dimensioned elevations showing grab bars, controls, shower hose, seat, etc. Two options are available for an accessible shower (1) a 36" by 36" transfer shower with seat or (2) a 60 inch minimum by 30 inch minimum roll-in shower.
Carl J. Westfall
Boise City IBC Plans Examiner
|
Plan Modification Accepted | | | 6/4/2012 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted to change the location of the parts room walls, the restroom door is moved to be more visible to the customers, the drinking fountain is moved to be more visible to the customers. Sheet A-2R was submitted with no change in value.
|
BLD-Energy code compliance | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | PART |
Mike Jordan
|
|
|
RICK Phone #: ###-####. Still needs to insulate atiic area in main shop.
|
BLD-Other | 4/27/2012 | 4/27/2012 | 4/27/2012 | P | PASS |
Mike Jordan
|
|
|
Draft stops inspection-Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2012 | 4/26/2012 | 4/26/2012 | A | PASS |
Mike Jordan
|
|
|
RICK Phone #: ###-####
|
BLD-Conference | 4/2/2012 | 4/2/2012 | 4/2/2012 | P | DONE |
Mike Jordan
|
|
|
Jobsite check up. Interior slab on grade has been placed. Interior steel stud walls being contructed and trades also working. Talked to contractor about draft stops.
|
BLD-Other | 3/7/2012 | 3/8/2012 | 3/8/2012 | A | PASS |
Mike Jordan
|
|
|
mike - shear Phone #: ###-####. Roof framing and shear ok.
|
BLD-Other | 1/31/2012 | 2/2/2012 | 2/2/2012 | A | PART |
Mike Jordan
|
|
|
MAsonry. 14ft. to 16ft. elevation on north and west walls. All cells were clean and reinforcement in place as per approved plans. Special inspector on site. Contractor work ing on paperwork work for control joints on north and south rated walls. Also noted masonry contractor employing cold weather controls as per IBC.
|
BLD-Other | 1/30/2012 | 1/31/2012 | 1/31/2012 | A | PASS |
Mike Jordan
|
|
|
tom - pre-grout Phone #: ###-####. on site to review special inspection reports and masonry work in progress.
|
BLD-Conference | 1/25/2012 | 1/25/2012 | 1/25/2012 | P | PART |
Mike Jordan
|
|
|
Msonry on east and west and south wall, top of wall. Contacted contractor to have special inspector leave reports on site for review.
|
BLD-Other | 1/11/2012 | 1/12/2012 | 1/12/2012 | P | PART |
Mike Jordan
|
|
|
Pre-grout inspection please Phone #: ###-####. Work in progress. Special inspector on site. Will grout 0' to 4' elevation on west and north wall and 4' to 8' elevation on east and south wall.
|
BLD-Footing | 12/20/2011 | 12/21/2011 | 12/21/2011 | P | CANC |
Mike Jordan
|
|
|
rick Phone #: ###-####
|
BLD-Foundation | 12/21/2011 | 12/21/2011 | 12/21/2011 | P | PASS |
Mike Jordan
|
|
|
rick Phone #: ###-####
|
BLD-Footing | 12/19/2011 | 12/20/2011 | 12/20/2011 | A | PASS |
Mike Jordan
|
|
|
rick Phone #: ###-####. Perimeter footing ok.
|
Print Occupancy Form | | | 12/20/2011 | | DONE |
Christina Prado
|
|
|
Original lost
|
BLD-Footing | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | NR |
Mike Jordan
|
|
|
rick - late morning please - pouring at 2 Phone #: ###-####. Work in progress. Inspection rescheduled for tommorrow.
|
Print Occupancy Form | | | 12/13/2011 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2011 | | DONE |
Christina Prado
|
|
|
Called and gave Dale fees due and advised ACHD letter is required prior to issuance of permit
|
Permit Ready to Issue | | | 12/13/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/13/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/28/2011 | | 12/12/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resolution of structural issues.
|
Plan assigned to (CJW) | 10/17/2011 | | 12/12/2011 | | PASS |
Carl Westfall
|
|
|
WESTSIDE MECHANICAL & MACHINE (20 days - Nov. 11)
|
Routing Off Site - STRUCTURAL | 12/12/2011 | | 12/12/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/9/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of plan sheets A-5A, A-7A, A-8A and structural calculations; taken to Carl Westfall
|
Telephone call | | | 12/9/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing Off Site - STRUCTURAL | 11/22/2011 | | 11/29/2011 | | FAIL |
Carl Westfall
|
|
|
Items not resolved.
|
Routing - PUBLIC WORKS | 11/25/2011 | | 11/28/2011 | | PASS |
Connie Baumgartner
|
|
|
Added drinking fountain.
|
Routing - PLANNING | 11/28/2011 | | 11/28/2011 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 11/28/2011 | | |
|
|
|
Received 2 copies of A-1A, A-6A, A-7A, A-8A, A-9A, M-1A, EN-1 and taken to Carl Westfall's desk
|
Routing - PLAN CHECK | 11/9/2011 | | 11/25/2011 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd review, except for structural. E-mailed a report to the Architect.
|
Plan resubmittals received | | | 11/22/2011 | | DONE |
Tisha Gallop
|
|
|
received engineers response and three copies of structural calcs and plan sheets S-1A, A-1A, A-2A, A-3A, A-4A, A-5A, A-6A, A-7A, A-8A, A-9A, EN-1, P-1A, M-1A, E-1A, IBC-1; routed one set to outside engineering and put two copies on Carl Westfalls desk.
|
Telephone call | | | 11/22/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - FIRE | 11/5/2011 | 11/5/2011 | 11/9/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 11/9/2011 | | FAIL |
|
|
|
Failed Planning and Building
|
Route to Impact Fee Review | 11/5/2011 | 11/10/2011 | 11/7/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 10/28/2011 | | 11/5/2011 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Nov 2 and finishe on Nov 5. Revised drawings were required. See the plan review report.
|
Routing - PLANNING Land Div | 10/31/2011 | | 10/31/2011 | | PASS |
Todd Tucker
|
|
|
ROS11-00028 has been finaled.
|
Routing - PLUMBING | 10/27/2011 | | 10/28/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC
|
Routing - PLANNING | 10/28/2011 | | 10/28/2011 | | FAIL |
Andrea Tuning
|
|
|
Lot line reduction is not complete.
|
Routing - Erosion and Sediment | 10/26/2011 | | 10/27/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00749 plan approved with conditions attached to the permit.
|
Routing Off Site - STRUCTURAL | 10/17/2011 | | 10/27/2011 | | FAIL |
Carl Westfall
|
|
|
Failed 1st structual review.
|
Routing - PUBLIC WORKS | 10/17/2011 | | 10/26/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 10/24/2011 | | 10/26/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto existing sewer service provided.
|
Routing PW Solid Waste | 10/24/2011 | | 10/24/2011 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 10/24/2011 | | 10/24/2011 | | PASS |
Walt Baumgartner
|
|
|
approved contingent upon use of approved design for flammable interceptor, must have vented headspace per Plumbing code requirements.
|
Routing PW Drainage | 10/18/2011 | | 10/21/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 10/18/2011 | | 10/18/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 10/17/2011 | | 10/17/2011 | | FAIL |
Dave Abo
|
|
|
Do not issue building permit until Record of Survey requirements are completed (provide copy of recorded deed and obtain new tax parcel number).
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 10/17/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/17/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/17/2011 | | DONE |
Christina Prado
|
|
|
called Action Couriers for pick up
|
Application received | | 10/17/2011 | | | DONE |
|
|
|
|