Letter of compliance/Occupancy | | | 10/9/2012 | | DONE |
|
|
|
|
BLD-Final | 9/5/2012 | 9/6/2012 | 9/6/2012 | A | PASS |
Tony Young
|
|
|
Brian Phone #: ###-####
|
DOC - Permit Finaled | 9/6/2012 | 9/6/2012 | 9/6/2012 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Final | 9/4/2012 | 9/5/2012 | 9/5/2012 | P | NR |
Tony Young
|
|
|
Brian Phone #: ###-####,, walk through only
|
BLD-Energy code compliance | 2/22/2012 | 2/23/2012 | 2/23/2012 | A | PASS |
Tony Young
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2012 | 2/21/2012 | 2/21/2012 | P | PASS |
Tom Arcoraci
|
|
|
Bryan Phone #: ###-####
|
BLD-Foundation | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,,, walls ok,,, work in progress,, ok to pour when ready
|
BLD-Footing | 11/30/2011 | 12/2/2011 | 12/2/2011 | P | PART |
Tony Young
|
|
|
eric Phone #: ###-####
|
PubWorks Subgrade Approval | 12/2/2011 | 12/2/2011 | 12/2/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 11/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CDM) | 10/24/2011 | 10/24/2011 | 11/14/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 11/14/2011 | | 11/14/2011 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 11/14/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 11/14/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/14/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/14/2011 | | DONE |
Tisha Gallop
|
|
|
called Doug Lasher and left vm permit is ready and fees.
|
1st review completed | | | 11/10/2011 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/7/2011 | | 11/10/2011 | | FAIL |
Carl D Madsen
|
|
|
Plans need to be modified to provide a landing at bottom of the stairs at the garage door. Left a message with Doug Lasher. 11-10-11 CDM
|
Route to Impact Fee Review | 10/17/2011 | 10/20/2011 | 11/8/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Grading-Hillside | 11/7/2011 | | 11/7/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING | 11/7/2011 | | 11/7/2011 | | PASS |
Cody Riddle
|
|
|
|
Routing - FIRE | 11/1/2011 | | 11/3/2011 | | PASS |
Scott Arellano
|
|
|
Plans are approved without special conditions.
|
Plan resubmittals received | | | 11/2/2011 | | DONE |
|
|
|
11-2-11 received 3 grading and drainage sheets sent to Carl M.
|
Routing - Erosion and Sediment | 10/27/2011 | | 11/1/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00741 plan approved with conditions attached to the permit.
|
Routing - MECHANICAL | 11/1/2011 | | 11/1/2011 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/26/2011 | | 10/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 10/27/2011 | | 10/27/2011 | | FAIL |
Colleen T Carroll
|
|
|
Plans do not indicate compliance with 10' side yard setback. A revised grading plan, that matches the architectural site plan, is required. Emailed applicant today. CER
|
Routing - MECHANICAL | 10/27/2011 | | 10/27/2011 | | FAIL |
Troy James
|
|
|
emailed corrections to geoff
|
Routing - Addressing | 10/24/2011 | | 10/26/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Grading-Hillside | 10/26/2011 | | 10/26/2011 | | FAIL |
Terry Records
|
|
|
Grading plan does not indicate proper setback from ascending slope at back of garage.
|
Intake Approval | | | 10/24/2011 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2011 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/17/2011 | | DONE |
Darla L Downs
|
|
|
|
Intake Approval | | | 10/17/2011 | | FAIL |
|
|
|
|
Application received | | 10/17/2011 | | | |
|
|
|
|