First Notice | | 5/28/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
Permanent Occupancy | | | 5/18/2015 | | DONE |
|
|
|
|
Third Notice | | 10/4/2012 | 10/9/2012 | | DONE |
|
|
|
|
Third Notice | | 9/7/2012 | 9/20/2012 | | DONE |
|
|
|
mailed to GC
|
Third Notice | | 8/6/2012 | 8/27/2012 | | DONE |
|
|
|
faxed
|
Second Notice | | 7/9/2012 | 8/1/2012 | | DONE |
|
|
|
|
First Notice | | 6/22/2012 | 6/29/2012 | | DONE |
|
|
|
|
BLD-Conference | 6/7/2012 | 6/12/2012 | 6/12/2012 | P | PASS |
Dave Hannah
|
|
|
Instruct tenant to complete occupancy request card and obtain final CO. ok for co
|
Permanent Occupancy | | | 6/12/2012 | | DONE |
Christina Prado
|
|
|
|
First Notice | 5/3/2012 | 5/3/2012 | 5/16/2012 | | DONE |
Dave Hannah
|
|
|
faxed 5-16-12
|
BLD-Aging Inspection | 5/3/2012 | 5/3/2012 | 5/3/2012 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/3/2012 | 5/3/2012 | 5/3/2012 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/22/2012 | 2/22/2012 | 2/22/2012 | A | PART |
Dave Hannah
|
|
|
Phone #: 2088701943 >> Inspection requested via mobile web by Kyle ok for temp occ after mec issues are done
|
FIRE-Final Inspection | 2/21/2012 | 2/22/2012 | 2/22/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 2/20/2012 | 2/21/2012 | 2/22/2012 | P | CANC |
Dave Hannah
|
|
|
Phone #: 2088701943 >> Inspection requested via mobile web by Kyle
|
Temporary Occupancy | 2/22/2012 | 5/22/2012 | 2/22/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 2/21/2012 | 2/21/2012 | 2/21/2012 | P | FAIL |
Troy Cobbley
|
|
|
The emergency lighting and exit signs have been repaired except for the two exit discharge lights and the emergency lights at the main northeast exit. Rescheduled for tomorrow morning.
|
FIRE-Final Inspection | 2/21/2012 | 2/21/2012 | 2/21/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide exit discharge lighting over the two northeast exterior exit doors per plan review, repair the emergency light just inside the main exit doors, repair the emergency light on the east side of the kitchen, provide the missing exit sign in the kitchen.
|
FIRE-Sprinkler Rough-in | 2/16/2012 | 2/16/2012 | 2/16/2012 | A | PART |
Forrest France
|
|
|
Ceilings at the opposite side of the new tenant demising wall to be maintained due to existing fire sprinkler protection. New pendent at this area to be installed per approved drawings.
|
FIRE-Conference | 2/13/2012 | 2/13/2012 | 2/14/2012 | P | DONE |
Forrest France
|
|
|
Regarding location of the manual pull station for the hood suppression system. Also discussed project related fire sprinkler work and general life safety conditions.
|
BLD-Framing/Rough-in | 2/13/2012 | 2/14/2012 | 2/14/2012 | A | PASS |
Dave Hannah
|
|
|
kyle - grid inspection Phone #: ###-####
|
BLD-Conference | 2/7/2012 | 2/8/2012 | 2/9/2012 | A | PART |
Dave Hannah
|
|
|
Kyle Phone #: ###-#### needs to make second exit ada complant
|
BLD-Wall cover | 1/5/2012 | 1/6/2012 | 1/6/2012 | A | PASS |
Dave Hannah
|
|
|
Call prior to going Phone #: 2088701943 >> Inspection requested via mobile web by Kyle ok to cover walls and ceiling soffits
|
Routing - PLAN CHECK | 12/7/2011 | | 12/15/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 11/14/2011 | | 12/15/2011 | | PASS |
Sam Zahorka
|
|
|
1st IBC plan review completed. corrections needed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2011 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 12/15/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 12/15/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 12/13/2011 | | |
|
|
|
12-13-11 received 1 plan review report,2 structural calc, and 2 copies of sheets A-1,A4,EL101, & 3 copies of sheet M1.2 sent to Sam Z
|
1st review completed | | | 12/7/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 12/2/2011 | | 12/7/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Case Summary (BLD) | | | 12/2/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/23/2011 | | 12/2/2011 | | FAIL |
Sam Zahorka
|
|
|
Corrections needed. Plan review sent to the architect.
|
Routing - PLUMBING | 11/17/2011 | | 11/23/2011 | | PASS |
Bill VanDegrift
|
|
|
1. Backflow to be installed before filter.
2. May require dcva on water service.
3. May require additional backflow on water to roof top.
4. May require addition backflow protection on icemaker.
5. Floor sinks not to be located under counters or equipment where they are not visible.
6. Per plans and 2003 UPC.
|
Routing - PUBLIC WORKS | 11/16/2011 | | 11/17/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/14/2011 | | 11/16/2011 | | PASS |
April Wing
|
|
|
Address was changed to 837 W Main St eff 6/30/11 See Address change form w/ PW routing sheet
|
Routing PW Environmental | 11/16/2011 | | 11/16/2011 | | PASS |
Walt Baumgartner
|
|
|
Two Canplas low profile grease traps for triple and double sink. No grease abatement for trench drain. Steam kettle for rice/beans, all meats comes in precooked.
|
Routing PW Sewer Rating | 11/16/2011 | | 11/16/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 11/10/2011 | | 11/14/2011 | | DONE |
Jason Blais
|
|
|
|
Application received | | 10/17/2011 | 11/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 11/9/2011 | | PASS |
Dan Stuart
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 10/17/2011 | | FAIL |
Dan Stuart
|
|
|
Plans and documents incomplete. Copy of Plan Intake checklist attached to BLD.
|