DOC - Permit Finaled | | | 3/6/2012 | | DONE |
Tisha Gallop
|
|
|
passed final inspections
|
BLD-Final | 2/6/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Jim Storey
|
|
|
JOHN Phone #: ###-####
|
FIRE-Final Inspection | 2/7/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Forrest France
|
|
|
Life safety finaled.
|
FIRE-Final Inspection | 2/6/2012 | 2/6/2012 | 2/7/2012 | P | NR |
Forrest France
|
|
|
Need to provide test method for verification of duct detector functionality.
|
PubWorks Occupancy Approval | 2/7/2012 | 2/7/2012 | 2/7/2012 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 2/6/2012 | 2/6/2012 | 2/6/2012 | P | PART |
Jim Storey
|
|
|
JOHN Phone #: ###-#### pending pw and plm sign offs
|
FIRE-Conference | 1/24/2012 | 1/24/2012 | 1/24/2012 | A | DONE |
Forrest France
|
|
|
Regarding associated permit # BLD11-02455 knox box.
|
BLD-Framing/Rough-in | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | NR |
Jim Storey
|
|
|
Soffits----john Phone #: ###-####
|
BLD-Footing | 11/23/2011 | 11/23/2011 | 11/23/2011 | P | PASS |
Jim Sly
|
|
|
scott - rebar Phone #: ###-#### - early afternoon please Trash enclosure footings OK.
|
Issue PAID IN FULL permit | | | 11/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 10/31/2011 | | 11/1/2011 | | PASS |
Tisha Gallop
|
|
|
Office copy taken to records
|
Case Summary (BLD) | | | 11/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/1/2011 | | DONE |
Tisha Gallop
|
|
|
called Hal and left vm permit is ready and fees
|
Plan assigned to (LEG) Tisha | 10/19/2011 | | 11/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 10/28/2011 | | 10/31/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 10/28/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets L2.1, L3.1 and L6.1; inserted into plans by permit tech. and routed to pw.
|
1st review completed | | | 10/28/2011 | | FAIL |
|
|
|
Failed Public Works, Erosion & Soil Control
|
Routing - PLAN CHECK | 10/28/2011 | | 10/28/2011 | | PEND |
Tisha Gallop
|
|
|
rerouted to pw
|
Routing - PLUMBING | 10/27/2011 | | 10/28/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC
|
Routing - PLANNING | 10/28/2011 | | 10/28/2011 | | PASS |
Joshua Johnson
|
|
|
Cup11-00066
|
Routing - FIRE | 10/28/2011 | | 10/28/2011 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown. No seperate Fire Comments attached to plans.
|
Routing - Erosion and Sediment | 10/26/2011 | | 10/27/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00749 plan approved with conditions attached to the permit.
|
Plan resubmittals received | | | 10/27/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked P2.0. Plans inserted by Christina
|
Routing - PUBLIC WORKS | 10/20/2011 | | 10/26/2011 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Peter McCullough contact at ###-####
|
Routing PW Drainage | 10/21/2011 | | 10/26/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | | | 10/25/2011 | | FAIL |
Clint A Smith
|
|
|
ESC11-00749 application failed due to being a commercial project. The applicant must apply with an ESC plan developed by a current Boise City Certified Plan Designer or with a plan waiver. Left a message with the applicant over what requirements are needed.
|
Routing PW Environmental | 10/24/2011 | | 10/24/2011 | | PASS |
Walt Baumgartner
|
|
|
OK, revised interior plumbing sheet to be included w/ TI plan set will show corrections for mop sink and floor sink to segregated grease line. Spoke to Laura Rassmussen, Tikker Eng 10/24/11.
|
Routing PW Solid Waste | 10/21/2011 | | 10/21/2011 | | FAIL |
Peter J. McCullough
|
|
|
Proposed location of trash enclosure does not meet ordinance requirements. Peter McCullough ###-####.
|
Routing PW Sewer Rating | 10/21/2011 | | 10/21/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 10/21/2011 | | 10/21/2011 | | FAIL |
Walt Baumgartner
|
|
|
interior plumbing sheet included w/ this grading/drainage plan needs correction. Indicate 1500 gallon size for grease interceptor
and correct to route mop sink and nearby floor sink to segregated grease line. I contacted Tikker engineering.
|
Routing - PLANNING Land Div | 10/20/2011 | | 10/20/2011 | | PASS |
Dave Abo
|
|
|
Lot 5, Block 1 of Southshore Shopping Center Subdivision
|
Application received | | 10/19/2011 | 10/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/19/2011 | | DONE |
Tisha Gallop
|
|
|
Called Hal and told him need plumbing sheet if wants to include grease interceptor in scope, he said will bring it in tomorrow.
|
Intake Approval | | | 10/19/2011 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/19/2011 | | DONE |
Tisha Gallop
|
|
|
|