Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-02570
StatusFinaled
Name BRIGHTON HOMES LLC
Site Address 4034 S BARD AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2,305 sq. ft., two story (first story 995 sq. ft, second story 1,310 sq. ft.) with 4 bedrooms, 2 1/2 bathrooms, approximately 210 sq. ft. of covered patio/porch and a 935 sq. ft. attached garage per the approved plans, plan review report and any notations. This structure is located in WUI zone B and requires a class A fire rated roofing material. SP-02 zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/20/20129/20/20129/20/2012PPASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
DOC - Permit Finaled9/20/20129/20/20129/20/2012PPASS
DetailsJim Storey
BLD-Energy code compliance7/3/20127/5/20127/5/2012APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
BLD-Framing/Rough-in6/28/20126/28/20126/28/2012PFAIL
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen. Complete lateral bracing on B6, A1 and A2 trusses.Strap double top plate break at wall in garage. Provide additional nailing into king stud at the two 9.5 LVL at garage side. Block other side if 11.75 LVL above bottom of stairs. Provide city approved plans. Ok to insu;late. Correction notice posted.
Plan resubmittals received  6/25/2012 DONE
new acca report
Routing - MECHANICAL6/25/2012 6/25/2012 PASS
DetailsTroy James
BLD-Wall Bracing6/18/20126/18/20126/18/2012PPASS
DetailsDave Hannah
Framer has requested if shear inspection can be performed at 2:00pm.
Thanks Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
BLD-Footing2/16/20122/16/20122/17/2012PPASS
DetailsDave Hannah
Chris-Would really like this inspection in the morning since he called yesterday but our computers were down Phone #: ###-####
BLD-Footing2/15/20122/15/20122/16/2012PPASS
DetailsDave Hannah
Chris Phone #: ###-####
Issue PAID IN FULL permit  2/10/2012 DONE
DetailsChristina Prado
OVERRIDE  12/19/2011  
Inspection Record Card- Bld  12/19/2011 DONE
Telephone call  12/19/2011 DONE
DetailsChristina Prado
Called and gave Seth fees due and advised permit is ready
Permit Ready to Issue  12/19/2011 DONE
DetailsChristina Prado
Plan assigned to (CDM) 10/24/201112/16/2011 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK12/15/2011 12/16/2011 PASS
DetailsCarl D Madsen
Case Summary (BLD)  12/16/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/16/2011  
Routing - PLANNING12/15/2011 12/15/2011 PASS
DetailsDavid Moser
Driveway location is OK with placement of "No Parking" sign.
1st review completed  11/21/2011 FAIL
Failed pending Planning approval. CDM
Routing - PLAN CHECK10/28/2011 11/21/2011 FAIL
DetailsCarl D Madsen
Failed pending Planning approval. CDM
Route to Impact Fee Review10/24/201110/27/201111/3/2011 PASS
DetailsCindy M. Gould
Routing - MECHANICAL10/31/2011 10/31/2011 PASS
DetailsTroy James
Routing - MECHANICAL10/27/2011 10/28/2011 PASS
DetailsTroy James
emailed corrections to AJ
Routing - PLANNING10/25/2011 10/27/2011 FAIL
DetailsDavid Moser
Driveway location does not match plat note on River Heights #2 Sub.
Routing - Addressing10/24/2011 10/25/2011 PASS
DetailsTerry Records
Routing - PUBLIC WORKS10/25/2011 10/25/2011 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  10/24/2011 DONE
DetailsChristina Prado
Intake Approval  10/24/2011 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  10/24/2011 DONE
DetailsChristina Prado
Application received 10/24/2011   
Routing - MECHANICAL6/25/2012   FAIL
resubmitted new acca report