DOC - Permit Finaled | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 12/7/2011 | 12/8/2011 | 12/9/2011 | P | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-####
|
FIRE-Final Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
FIRE-Conference | 11/29/2011 | 11/30/2011 | 11/30/2011 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding fire life safety inspection items related to modifications to existing wall locations.
|
BLD-Framing/Rough-in | 11/29/2011 | 11/30/2011 | 11/30/2011 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
Routing - PLAN CHECK | 11/29/2011 | | 11/29/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with reduced scope of work. No longer enlarging office over exterior patio egress door. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/29/2011 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/29/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 10/25/2011 | | 11/29/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/25/2011 | | 10/28/2011 | | FAIL |
Tim L. Woodard
|
|
|
Part of work proposed cannot be done due to previous reviews identifying the exterior balcony as non-compliant. Tim Woodard
|
1st review completed | | | 10/28/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/28/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 10/24/2011 | 10/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 10/24/2011 | | PASS |
Tim L. Woodard
|
|
|
|