BLD-Final | 6/20/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Mike Jordan
|
|
|
Ray Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Ray Phone #: ###-####
|
Permanent Occupancy | | | 6/21/2019 | | DONE |
|
|
|
|
BLD-Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | P | NR |
Mike Jordan
|
|
|
Ray Phone #: ###-####. fire/life/safety has failed.
|
FIRE-Final Inspection | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | FAIL |
Jim Page
|
|
|
Numerous escutcheons are missing throughout on the fire sprinkler heads. Fire sprinkler coverage needs to be corrected in womens locker room basement level. Fire sprinklers were added to a closet without a permit. Head coverage issues throughout building, fire sprinkler coverage will need to be corrected under an issued permit, any modifications to the fire sprinkler system requires a p[ermit. Exit signs need serviced throughout. Provide fire sprinkler under HVAC unit in tennis court area. Overhead door on tennis court needs to be measured when open, if door exyends back more than 48 inches then a fire sprinkler will be required.
Ray Phone #: ###-####
|
Print Occupancy Form | | | 12/20/2018 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | FAIL |
Troy Cobbley
|
|
|
See the upper level and lower level approved floor plans for a list of corrections that need addressed. They include modified sprinkler coverage missing exit signs and missing occupant load sign.
|
Issue PAID IN FULL permit | | | 11/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 11/1/2011 | | 11/7/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 11/4/2011 | | 11/7/2011 | | PASS |
Scott Arellano
|
|
|
Field Verify. Discussed project with Scott. He indicated since it was just an occupancy to proceed like normal. TLW
|
1st review completed | | | 11/7/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/7/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 11/7/2011 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2011 | | DONE |
|
|
|
t/c w sam - permit ready
|
Permit Ready to Issue | | | 11/7/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/2/2011 | | 11/4/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with Redlines.
|
Routing PW Sewer Rating | 11/2/2011 | | 11/2/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/1/2011 | | 11/2/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 11/2/2011 | | 11/2/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/1/2011 | | DONE |
|
|
|
11-1-11 ok per Tim W to take in ///dld
|
First Notice | | 7/1/2019 | | | |
|
|
|
|
Application received | | 11/1/2011 | | | |
|
|
|
|