Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-02654
StatusFinaled
Name GRAY CHRIS L
Site Address 3910 W CLEMENT RD
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the enclosure of an existing porch/breezway to create a new closet, pantry area. The outside of this enclosure is the existing roof support structure allowing for the reconfiguration of the new entry area. The is to be a laundry area relocated fromits interior location. the master bathroom will be reconfigured a shower added where the existing pantry with new pantry located in the new enclosed area. the double doors from the master to the exterior may be framed in as long as code complying egress is achieved. R-1C ok per JRJ. Separate electrical, plumbing and mechanical permits are required. All per the approved pans as marked, energy prescriptive approach, and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/2/201112/2/201112/2/2011PPASS
DetailsTom Arcoraci
call 15 min prior to meet//Chris Phone #: ###-####
DOC - Permit Finaled12/2/201112/2/201112/2/2011PPASS
DetailsTom Arcoraci
BLD-Final11/8/201111/8/201111/8/2011PCANC
DetailsTom Arcoraci
Chris Phone #: ###-####
BLD-Framing/Rough-in11/8/201111/8/201111/8/2011PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in11/3/201111/4/201111/4/2011APART
DetailsTom Arcoraci
Chris Phone #: ###-#### ok to insulate pending rough in inspections
Application received 11/3/201111/3/2011 DONE
DetailsBarbara Stitt
Routing Walk-In (Zoning)11/3/201111/3/201111/3/2011PPASS
DetailsJoshua Johnson
Routing Walk-In (BLD)11/3/201111/3/201111/3/2011PDONE
DetailsPerry Paine
Plan assigned to (PEP)11/3/201111/3/201111/3/2011 PASS
DetailsPerry Paine
Case Summary (BLD)  11/3/2011  
Inspection Record Card- Bld  11/3/2011  
1st review completed  11/3/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/3/2011 DONE
Override - Parcel Holds  11/3/2011  
Permit Ready to Issue  11/3/2011 DONE
Override - Parcel Holds  11/3/2011  
Issue PAID IN FULL permit  11/3/2011 DONE
DetailsTisha Gallop