First Notice | | 6/1/2014 | 6/3/2014 | | DONE |
|
|
|
old project
|
Permanent Occupancy | | | 5/22/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/1/2014 | 5/2/2014 | 5/2/2014 | A | PASS |
Mike Jordan
|
|
|
shawn Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | FAIL |
Forrest France
|
|
|
Correction items include; post "door to remain unlocked while building is occupied" sign at the main entry/exit, provide single action hardware at the back exit per plan review annotations, repair exit sign/ emergency light above the back exit door. Also noted existing fire sprinkler coverage is overspaced off adjacent walls at the office and main lobby areas (three locations). Partition walls do not appear to have been included in the original design and constructed without permit at a later date. Any modifications to an existing fire sprinkler system will require a separate permit and be completed by a state licensed contractor. See plan notes and permit card for details.
|
Override - Parcel Holds | | | 11/23/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 11/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 11/14/2011 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2011 | | DONE |
Christina Prado
|
|
|
called and gave Jim amount due and advised GC/RCE form required
|
Permit Ready to Issue | | | 11/14/2011 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 11/10/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/10/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 11/4/2011 | | 11/10/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/7/2011 | | 11/10/2011 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
Plan resubmittals received | | | 11/8/2011 | | |
|
|
|
Received the registered design professional form and taken to Tim Woodard
|
Routing PW Sewer Rating | 11/7/2011 | | 11/7/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLUMBING | 11/7/2011 | | 11/7/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
May require additional backflow protection.
|
Routing - PUBLIC WORKS | 11/4/2011 | | 11/7/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 11/4/2011 | 11/4/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 11/4/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/4/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Addressing | 11/4/2011 | | 11/4/2011 | | PASS |
Terry Records
|
|
|
|