Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD11-02695
StatusFinaled
Name EAU CLAIRE GARY
Site Address 11505 W FAIRVIEW AVE
Project NameCANYON RIDGE CHURCH
Customer Number 
ePlanReviewNo
Description
(CANYON RIDGE CHURCH - INTERMEDIATE CHILD CARE CENTER) Church is acting as GC--To share a 1,152 sq. ft. area of the Canyon Ridge Church, created under BLD11-00340, used as classrooms for worship services, for use as a new intermediate a new child care center area when not used as classroom for worship services, in an existing 5,514 sq. ft. assembly church space within an existing building. The approved usable daycare area does not include use of the worship seating area or the second level mezzanine. Work to include installation of a movable desk and gate at the defined limit of the daycare area from the worship areas from the janitors closet wall to the worship area wall per plans. Change door hardware to doors 107, 108 and 109 as necessary to allow emergency unlocking by staff from the access side and to be openable from the egress side without a key or special knowledge or effort; install smoke detectors/alarms. Accessibility requirements, other exit doors and hardware, emergency illumination and exit signage, drinking fountains and safety galzing were addressed as part of BLD11-00340 when tenant space for church was created.NOTE: This building is fully fire sprinklered for area and story increase. The maximum occupant load of the daycare area is 20 children from 2-1/2 yrs of age and older with 3 teachers per CUP11-00056. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/13/20121/9/2012 DONE
First Notice 1/1/20121/3/2012 DONE
DetailsChristina Prado
mailed 01-03-12
Permanent Occupancy  12/22/2011 DONE
DetailsBarbara Stitt
BLD-Final12/20/201112/21/201112/21/2011APASS
DetailsMike Jordan
Verla Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection12/19/201112/20/201112/20/2011PPASS
DetailsTroy Cobbley
life safety passed. One additional smoke alarm needs to be installed outside of the sleeping room. Battery powered is ok. Building inspector please verify.
Routing - PUBLIC WORKS12/9/2011 12/12/2011 PASS
DetailsConnie Baumgartner
Checking on fixtures due to questions on fees by customer//12-9-11--SWR permit voided plans returned 12-12-11 new new calculations printed out 12-12-11 BAS
Issue PAID IN FULL permit  12/12/2011 DONE
DetailsBarbara Stitt
Routing - FIRE12/1/201112/1/201112/6/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (DRS)11/9/2011 12/6/2011 PASS
DetailsDan Stuart
1st review completed  12/6/2011 PASS
Routing - PLAN CHECK12/6/2011 12/6/2011 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  12/6/2011 PASS
Print Occupancy Form  12/6/2011 DONE
Permit Ready to Issue  12/6/2011 DONE
DetailsTisha Gallop
Telephone call  12/6/2011 DONE
DetailsTisha Gallop
called Randy Haverfield and told him permit is ready and fees and need GC/RCE/form
Route to Impact Fee Review12/1/201112/6/201112/5/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK11/10/2011 12/1/2011 PEND
DetailsDan Stuart
Resubmittals not required. Routing to fire code analyst for review.
Routing - PLANNING11/10/2011 11/10/2011 PASS
DetailsSue Cummings
CUP11-00056
Routing PW Sewer Rating11/10/2011 11/10/2011 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS  11/10/2011 PASS
Routing - Addressing11/9/2011 11/10/2011 PASS
DetailsTerry Records
Plan Reviewer's activity  11/9/2011 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD for evaluation of any impact fees due. Our Permit Counter will need written verification from ACHD prior to the building permit being issued.
Pending Assignment by JCB11/8/2011 11/9/2011 DONE
DetailsJason Blais
Application received 11/8/201111/8/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/8/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/8/2011 DONE
DetailsTisha Gallop
Intake Approval  11/8/2011 PASS