Third Notice | | 1/22/2012 | 2/1/2012 | | DONE |
Christina Prado
|
|
|
Done 2/1/12
|
Second Notice | | 1/13/2012 | 1/17/2012 | | DONE |
Christina Prado
|
|
|
faxed 1-17-12
|
First Notice | | 12/25/2011 | 1/3/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/15/2011 | | DONE |
|
|
|
|
BLD-Final | 12/13/2011 | 12/14/2011 | 12/14/2011 | P | PASS |
Mike Jordan
|
|
|
call 30 min prior to meet///Marvin Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 12/13/2011 | 12/14/2011 | 12/14/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 12/13/2011 | 12/13/2011 | 12/13/2011 | P | DONE |
Troy Cobbley
|
|
|
I went over exit sign/emergency light requirments with the general contractor. Per Tim exit discharge lighting is not required.
|
BLD-Other | 12/12/2011 | 12/13/2011 | 12/13/2011 | A | PASS |
Mike Jordan
|
|
|
martin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/25/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Mike Jordan
|
|
|
Ron-PLease call for access information Phone #: ###-####. Interior wood stud walls ok. no grid.
|
Print Occupancy Form | | | 11/21/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/21/2011 | | DONE |
Christina Prado
|
|
|
No phone call made, applicant came to pick permit up before ready
|
Plan resubmittals received | | | 11/21/2011 | | DONE |
Tisha Gallop
|
|
|
received revised cert of value from tenant upon issuance of permit, see scanned document
|
Issue PAID IN FULL permit | | | 11/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 11/18/2011 | | 11/18/2011 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/18/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan Reviewer's activity | | | 11/18/2011 | | DONE |
Tim L. Woodard
|
|
|
Although the scaling was off a little on the hallway portion of the plan the architect assured me that upon field measuring the distance four feet was availible in front of the space. Also the architect submitted a spec sheet on the apron being attached to the high side of the drinking fountain. TLW
|
Case Summary (BLD) | | | 11/18/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | | | 11/18/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/9/2011 | | 11/17/2011 | | FAIL |
Tim L. Woodard
|
|
|
Drinking fountain projection and clear floor space in front of door to room 113. TLW Discussed issues with architect and he will resubmit tomorrow.
|
1st review completed | | | 11/17/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/9/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/9/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/9/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PUBLIC WORKS | 11/9/2011 | | 11/9/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/9/2011 | | 11/9/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 11/9/2011 | | 11/9/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 11/9/2011 | | | |
|
|
|
|