Permit Information
Permit NumberBLD11-02729
StatusFinaled
Name CALIENTE SALON
Site Address 605 S AMERICANA BLVD
Project NameCaliente Salon -1st Flr
Customer Number 
ePlanReviewNo
Description
(CALIENTE SALON - 1ST STORY) This building does not have a fire sprinkler system. To remodel a 1,250 square foot space and a 2,919 square foot space (combined area of 4,169 square feet) located on the 1st story of an existing building. These spaces will be used as a salon with a retail sales element. Salon services include manicures, facials, cutting hair, and body piercings. This is an existing 2 story building (5,793 square foot 1st story and 3,407 square foot 2nd story). Work is to include interior nonbearing walls, a shower room with a shower accessible to the disabled, a high and a low drinking fountain, interior doors, millwork, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/26/20125/29/2012 DONE
DetailsChristina Prado
done 05-25-12
First Notice 5/10/20125/16/2012 DONE
DetailsChristina Prado
faxed 5-16-12
FIRE-Final Inspection4/27/20124/30/20124/30/2012APASS
DetailsForrest France
Fire life safety inspection completed acceptable.
BLD-Final4/30/20124/30/20124/30/2012PPASS
DetailsDave Hannah
MITCH Phone #: ###-####
Permanent Occupancy  4/30/2012 DONE
DetailsChristina Prado
BLD-Final4/26/20124/27/20124/27/2012PNR
DetailsDave Hannah
Mitch Phone #: ###-#### everything is ok but they need to got a fire life saftey inspection
BLD-Framing/Rough-in2/27/20122/28/20122/28/2012APASS
DetailsDave Hannah
MITCH Phone #: ###-####
Office Staff conference/action  1/3/2012  
I spoke with the owner Mr. Olson in response to his complaint to the Mayor's Office. We discussed the one week routing delay that occurred, his concern over the requirement to install drinking fountains and the fees which were over $4000 ($3000 were sewer connection fees). I addressed the routing error with the staff involved and assigned the building official to write legislation/or a new rule for approval by the State of Idaho Building Code Board to modify the drinking fountain requirements in code.
OVERRIDE  12/29/2011  
Issue PAID IN FULL permit  12/29/2011 DONE
DetailsTisha Gallop
Routing - PUBLIC WORKS12/29/2011 12/29/2011 PASS
DetailsConnie Baumgartner
Drinking fountains added
Routing - PLAN CHECK12/24/2011 12/29/2011 DONE
DetailsCarl Westfall
Completed the IBC resubmittal review on a Saturday. Could not route back to PW because no one was there. Routed back to PW on the following Thrusday after I returned back from vacation..
Routing - PLAN CHECK12/29/2011 12/29/2011 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  12/29/2011 DONE
Print Occupancy Form  12/29/2011 DONE
Telephone call  12/29/2011 DONE
t/c w thomas - permit ready and fees given - also need ACHD receipt and RP name
Permit Ready to Issue  12/29/2011 DONE
Details
Plan assigned to (CJW)11/15/2011 12/29/2011 PASS
DetailsCarl Westfall
CALIENTE SALON (20 days - Dec 9)
Routing - PLAN CHECK12/9/2011 12/24/2011 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Plan resubmittals received  12/21/2011  
Received 2 copies of sheets A1-1, A2-1, A2-2, A2-3, E1.0, E2.0, M0.0, M0.1, P1.0, P1.1, H1.0 and taken to Carl Westfall
Routing - FIRE12/3/201112/3/201112/9/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  12/9/2011 FAIL
Failed Plan Check
Route to Impact Fee Review12/3/201112/8/201112/5/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK11/29/2011 12/3/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on Nov 30 and finished on Dec 3. Revised drawings were required. See the plan review report. A week was lost in the routing time because it was erroneously sent to Fire before Building.
Routing - FIRE11/23/2011 11/29/2011  
Erroneously routed to Fire before Building by Mechanical. Lost 1 week in routing time. CJW
Routing - MECHANICAL11/22/2011 11/23/2011 PASS
DetailsTroy James
Routing - PLUMBING11/17/2011 11/22/2011 PASS
DetailsBill VanDegrift
hair sinks must be provided with approved cross connection control at the faucet. pipe water heater t&p to an approved location. verify existing cross connection control.
Routing PW Sewer Rating11/17/2011 11/17/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS11/17/2011 11/17/2011 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment11/17/2011 11/17/2011 PASS
DetailsClint A Smith
ESC11-00819 plan waiver appproved with conditions attached to the permit.
Routing - Addressing11/15/2011 11/16/2011 PASS
DetailsTerry Records
Plans ACCEPTED BY PLAN TECH  11/15/2011 DONE
DetailsBarbara Stitt
Plan Reviewer's activity  11/15/2011 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD for evaluation of any impact fees. Written verification from ACHD is needed prior to permit issuance.
Pending Assignment by JCB11/15/2011 11/15/2011 DONE
DetailsJason Blais
Intake Approval  11/14/2011 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  11/14/2011 DONE
DetailsBarbara Stitt
Application received 11/10/201111/10/2011 DONE
DetailsDarla L Downs
Intake Approval  11/10/2011 FAIL
Need ESC application and waiver letter.