Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD11-02789
StatusFinaled
Name CARTER WILLIAM N
Site Address 1621 N ORCHARD
Project NameTOM SWEENEYS DUTCH OVEN CAFE
Customer Number 
ePlanReviewNo
Description
(TOM SWEENEY'S DUTCH OVEN CAFE) (CAR11-00007 and DRH11-00233) This building does not have a fire sprinkler system. To convert the 1,581 square foot 1st story of a former single family dwelling to a restaurant. To remodel the 2nd story to create a 1,091 square foot residential apartment. Work that relates to the 1st story includes 2 restrooms accessible to the disabled, interior bearing and nonbearing walls, an exterior ramp accessible to the disabled, new doors, a zero clearance grease hood, a grease duct system having a UL listed 1-hr grease duct wrap, a 1-hr horizontal dwelling unit separation between the 1st and 2nd story, 1-hr columns and beams and walls supporting the horizontal separation, a new stairway to the basement, bearing walls with concrete footings in the basement/crawlspace to shorten the span of existing 1st story floor joists, kitchen equipment, and interior finishes. Work that relates to the 2nd story includes a 1-hr stairway shaft with 1-hr doors, a new stairway to the 2nd story within the 1-hr shaft, interior nonbearing walls, millwork, and finishes. The 2nd story dwelling unit is not required to be accessible to the disabled. Special Inspection is required for welding and epoxy anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. It there is a conflict between the adopted codes and the specifications and/or drawings, the provisions of the adopted codes govern. Garage demolition, rough grading, and grading & drainage work was all done under separate permits. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/25/201211/14/2012 DONE
First Notice 9/24/201210/15/2012 DONE
Zoning Approval9/14/20129/14/20129/14/2012 DONE
DetailsJosh Wilson
Permanent Occupancy  9/14/2012 DONE
DetailsChristina Prado
BLD-Final9/11/20129/12/20129/12/2012PPASS
DetailsTom Arcoraci
3 pm
BLD-Final9/10/20129/12/20129/12/2012ANR
DetailsTom Arcoraci
early
BLD-Aging Inspection8/13/20128/13/20128/13/2012 PEND
DetailsTom Arcoraci
Temporary Occupancy6/22/20129/20/20126/22/2012 DONE
DetailsChristina Prado
PubWorks Occupancy Approval6/22/20126/22/20126/22/2012 DONE
DetailsTiffany Lowery
BLD-Final6/13/20126/15/20126/15/2012APART
DetailsTom Arcoraci
ok for temp occ ok for perm when others sign perm
FIRE-Final Inspection6/13/20126/15/20126/15/2012APASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference6/11/20126/13/20126/13/2012PPASS
DetailsTom Arcoraci
ready for final
FIRE-Conference6/8/20126/13/20126/13/2012ADONE
DetailsTroy Cobbley
I went over life safety requirements with Bill. Found two exit signs with no battery backup.Need address numbers and fire extinguishers.
BLD-Conference6/8/20126/11/20126/11/2012PPASS
DetailsTom Arcoraci
BLD-Conference6/11/20126/11/20126/11/2012APASS
DetailsTom Arcoraci
BLD-Conference6/6/20126/8/20126/8/2012APASS
DetailsTom Arcoraci
discuss final
BLD-Conference6/6/20126/6/20126/6/2012PPASS
DetailsTom Arcoraci
BLD-Conference6/6/20126/6/20126/6/2012APASS
DetailsTom Arcoraci
BLD-Wall cover6/4/20126/4/20126/4/2012PPASS
DetailsTom Arcoraci
BLD-Wall cover6/1/20126/1/20126/1/2012PPASS
DetailsTom Arcoraci
BLD-Wall cover5/29/20125/29/20125/29/2012PPASS
DetailsTom Arcoraci
BLD-Wall cover5/16/20125/17/20125/17/2012APASS
DetailsTom Arcoraci
BLD-Wall cover3/21/20123/21/20123/21/2012PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in3/7/20123/7/20123/7/2012PPART
DetailsTom Arcoraci
3 pm ok after mech is ok
BLD-Conference2/29/20122/29/20122/29/2012APASS
DetailsTom Arcoraci
BLD-Conference2/22/20122/22/20122/22/2012PPASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  1/11/2012 DONE
DetailsChristina Prado
Print Occupancy Form  12/27/2011 DONE
Permit Ready to Issue  12/27/2011 DONE
Telephone call  12/27/2011  
12-27-11 called Richard left message permit ready and fee given . Also need ACHD & GC ///DLD
Routing - PLAN CHECK12/20/2011 12/24/2011 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  12/24/2011 DONE
Plan assigned to (CJW)11/18/2011 12/24/2011 PASS
DetailsCarl Westfall
TOM SWEENEY'S DUTCH OVEN CAFE (20 days - Dec 15)
Plan resubmittals received  12/23/2011 DONE
DetailsTisha Gallop
received two copies of plan sheet A-2; taken to Carl Westfall.
Plan resubmittals received  12/21/2011  
Received 1 cover letter dated 12-21-11 from Tom Wilson to Carl Westfall, 1 copy of plan review report dated 12-16-11, 2 copies of calc's and comments on 8 1/2 x 11, 2 copies of sheets T1, S2, A2, A3, A4, CN-1, CN-2, M0.0, M0.1, P1.0, P1.1, P2.1, H1.0, H2.1 and taken to Carl Westfall
Route to Impact Fee Review12/16/201112/21/201112/20/2011 PASS
DetailsCindy M. Gould
Routing - FIRE12/16/201112/16/201112/20/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  12/20/2011 FAIL
Failed Plan Check
Routing - PLAN CHECK11/30/2011 12/16/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on Dec 8 and finished on Dec 16. Revised drawings were required. See the plan review report.
Routing - PLUMBING11/29/2011 11/30/2011 PASS
DetailsBill VanDegrift
May require additional backflow protection.
Per plans and 2003 UPC.
Routing - Design Review11/30/2011 11/30/2011 PASS
DetailsJosh Wilson
Josh Wilson - DRH11-00233
Routing - PLANNING11/30/2011 11/30/2011 PASS
DetailsJoshua Johnson
Josh Johnson - CAR11-00007
Routing - Erosion and Sediment11/28/2011 11/29/2011 PASS
DetailsClint A Smith
Reference ESC11-00711
Routing PW Sewer Rating11/28/2011 11/28/2011 PASS
DetailsConnie Baumgartner
Routing PW Street Lights11/28/2011 11/28/2011 PASS
DetailsMike D Hedge
Per Rob ok for lights
Routing - PUBLIC WORKS  11/28/2011 PASS
Routing PW Solid Waste11/23/2011 11/23/2011 PASS
DetailsPeter J. McCullough
Approved for carts only (no dumpster) Carts to be collected on Bond Street.
Routing PW Drainage11/22/2011 11/23/2011 PASS
DetailsBrian Murphy
Routing - Addressing11/18/2011 11/21/2011 PASS
DetailsTerry Records
Plans ACCEPTED BY PLAN TECH  11/18/2011 DONE
DetailsChristina Prado
Intake Approval  11/18/2011 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  11/18/2011 DONE
DetailsChristina Prado
Pending Assignment by JCB11/18/2011 11/18/2011 DONE
DetailsJason Blais
Plan Reviewer's activity  11/18/2011 DONE
DetailsJason Blais
Emailed representative to contact ACHD for evaluation of impact fees and if an inspection is required. Written verification will be required from ACHD to our Permit Counter prior to the building permit being issued.
Application received 11/18/2011