Third Notice | | 2/7/2012 | 2/7/2012 | | DONE |
Rita DeYoung
|
|
|
Cont. was contracted to do $3950.00 only.
|
Second Notice | | 1/27/2012 | 2/2/2012 | | DONE |
Christina Prado
|
|
|
mailed 2-3-12
|
First Notice | 1/6/2012 | 1/6/2012 | 1/17/2012 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/5/2012 | 1/6/2012 | 1/6/2012 | A | PASS |
Tom Arcoraci
|
|
|
heather Phone #: ###-####
|
DOC - Permit Finaled | 1/6/2012 | 1/6/2012 | 1/6/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 1/3/2012 | 1/5/2012 | 1/5/2012 | A | PASS |
Forrest France
|
|
|
Noted corrections finished. Life safety finaled.
|
BLD-Final | 12/29/2011 | 12/30/2011 | 1/3/2012 | P | NR |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 12/29/2011 | 12/30/2011 | 12/30/2011 | A | FAIL |
Forrest France
|
|
|
Install exit signs per approved plan. Signs must be illuminated at all times and include a backup power source. Okayed one exit sign as is due to EM lighting in the hallway.
|
BLD-Final | 12/29/2011 | 12/29/2011 | 12/29/2011 | P | DEFR |
Jim Storey
|
|
|
HEATHER Phone #: ###-#### pm 12/30
|
FIRE-Final Inspection | 12/29/2011 | 12/29/2011 | 12/29/2011 | P | FAIL |
Forrest France
|
|
|
Need project related fire sprinkler permit final prior to fire life safety approvals. Noted non-compliant hardware at one location per red lined plan annotations.
|
FIRE-Conference | 12/1/2011 | 12/2/2011 | 12/2/2011 | A | PASS |
Troy Cobbley
|
|
|
Went over sprinkler and emergency light requirements with heather Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/29/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 11/18/2011 | | 11/28/2011 | | PASS |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 11/21/2011 | | 11/28/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | | | 11/28/2011 | | PASS |
|
|
|
Verify in field CDM
|
1st review completed | | | 11/28/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/28/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/28/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/28/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/28/2011 | | DONE |
Tisha Gallop
|
|
|
called Matter Arch. and told Liz permit is ready and fees.
|
Plan assigned to (TLW) | 11/18/2011 | | 11/21/2011 | | DEFR |
Tim L. Woodard
|
|
|
Plans Deffered to Carl Madsen for review. TLW
|
Plans ACCEPTED BY PLAN TECH | | | 11/18/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/18/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/18/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 11/18/2011 | | | |
|
|
|
|