Case Summary (BLD) | | | 6/21/2017 | | DONE |
|
|
|
|
DOC - Permit Expired | | | 6/21/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
As per Brian Murphy this permit is to be expired
|
BLD-Aging Inspection | 8/17/2012 | 8/20/2012 | 8/21/2012 | A | NR |
Jim Sly
|
|
|
Dave phone ###-#### Need Fire, Electr, Mech. Plumb and P/W finals
|
Case Summary (BLD) | | | 12/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 12/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
Called and told Cory that permit is ready & fees due on 12-22-11 @ 11:05am//BAS
|
Issue PAID IN FULL permit | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 12/21/2011 | | 12/22/2011 | | PASS |
Tisha Gallop
|
|
|
passed all departments; office copy taken to records.
|
Plan assigned to (LEG) Tisha | 11/18/2011 | | 12/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 12/20/2011 | | 12/21/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 12/20/2011 | | 12/21/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 12/16/2011 | | 12/20/2011 | | PEND |
Tisha Gallop
|
|
|
routed to pw
|
Plan resubmittals received | | | 12/20/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of G1, and five copies of plan sheets C2.1, C2.2 and three copies of Shallow Injection Well Form, Drainage Report, O & M; inserted by Bill Matter and rerouted to PW.
|
Routing - PUBLIC WORKS | 12/16/2011 | | 12/16/2011 | | FAIL |
Connie Baumgartner
|
|
|
Still failed by Brian Murphy
|
Routing PW Solid Waste | 12/16/2011 | | 12/16/2011 | | PASS |
Peter J. McCullough
|
|
|
Location of enclosure must as shown in sheet C2.2
|
1st review completed | | | 12/12/2011 | | FAIL |
|
|
|
Failed Public Works
|
Routing - FIRE | 12/9/2011 | | 12/12/2011 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - PLAN CHECK | 12/8/2011 | | 12/9/2011 | | PEND |
Tisha Gallop
|
|
|
routed to Fire
|
Routing - PLUMBING | 12/7/2011 | | 12/8/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Routing - PLANNING | 12/8/2011 | | 12/8/2011 | | PASS |
Andrea Tuning
|
|
|
This approval is for grading and drainage only and the applicant shall utilize Sheet G1 Site and Utility Plan.
|
Routing - Erosion and Sediment | 12/6/2011 | | 12/7/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00833 plan approved with conditions attached to the permit.
|
Routing - PUBLIC WORKS | 11/18/2011 | | 12/6/2011 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 12/6/2011 | | 12/6/2011 | | FAIL |
Peter J. McCullough
|
|
|
Needs to be reviewed by Peter McCullough for trash enclosure requirements.
|
Routing PW Sewer Design | 11/28/2011 | | 12/5/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto existing sewer service provided.
|
Routing PW Sewer Rating | 11/28/2011 | | 11/28/2011 | | PASS |
Connie Baumgartner
|
|
|
sewer fees will be assessed with tenant improvement.
|
Routing PW Drainage | 11/21/2011 | | 11/28/2011 | | FAIL |
Brian Murphy
|
|
|
WAITING ON REVISED PLANS
|
Routing - Addressing | 11/21/2011 | | 11/21/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Environmental | 11/21/2011 | | 11/21/2011 | | PASS |
Walt Baumgartner
|
|
|
1500 gallon GI noted on civil plans for grading/drainage. OK
|
Application received | | 11/18/2011 | 11/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/18/2011 | | DONE |
Tisha Gallop
|
|
|
check in safe
|
Routing - PLANNING Land Div | 11/18/2011 | | 11/18/2011 | | PASS |
Dave Abo
|
|
|
For grading only.
|
Intake Approval | | | 11/18/2011 | | PASS |
Tisha Gallop
|
|
|
|