Permanent Occupancy | | | 1/27/2012 | | DONE |
|
|
|
|
BLD-Final | 1/24/2012 | 1/25/2012 | 1/25/2012 | P | PASS |
Jim Sly
|
|
|
fabby Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 1/24/2012 | 1/25/2012 | 1/25/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 1/9/2012 | 1/10/2012 | 1/10/2012 | P | NR |
Jim Sly
|
|
|
bonnie Phone #: ###-#### Need fire final
|
FIRE-Final Inspection | 1/9/2012 | 1/10/2012 | 1/10/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on one of the main storefront exit doors. The other door can remain keyed except that it will need the sticker. Also provide provide single action hardware on both doors that exit out through the office or remove the exit sign and only provide single action hardware on the exterior office exit door.
|
Issue PAID IN FULL permit | | | 1/3/2012 | | DONE |
Christina Prado
|
|
|
Issued and mailed
|
Print Occupancy Form | | | 11/22/2011 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2011 | | DONE |
|
|
|
left message with rosie - permit ready
|
Permit Ready to Issue | | | 11/22/2011 | | DONE |
|
|
|
|
Application received | | 11/21/2011 | 11/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 11/21/2011 | | 11/21/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/21/2011 | | 11/21/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 11/21/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/21/2011 | | DONE |
Tim L. Woodard
|
|
|
|
First Notice | | 2/6/2012 | | | |
|
|
|
|