Permit Information
Permit NumberBLD11-02816
StatusIssued
Name WESTPARK II LTD PARTNERSHIP
Site Address 305 N STEELHEAD WAY
Project NameFULL PRO LLC
Customer Number 
ePlanReviewNo
Description
(FULLPRO) To remodel an existing 10,300 sq. ft. 'VANILLA SPACE' created under BLD08-00547, to be a mixed use office warehouse area. This space is required to be fully accessible per current code as the "Vanilla Finish' permit made a complying space into a noncompliant space. Work includes construction of 161 lineal feet of full height interior non-bearing wall and interior finishes per chapter 8 of the 2009 IBC. Maximum occupant load of 15 persons allowed (post near main entrance/exit) in this space per Building Official approval. This building was brought into compliance with Boise City under BLD05-00574 then later split into three separate tenant spaces under BLD08-00547, -00548, -00549. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. A racking permit is required if storage racks exceeding 8 ft. in hieght are installed. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection12/28/201112/29/201112/29/2011AFAIL
DetailsForrest France
Missing fire extinguishers throughout, EM lights at several locations are not functional.
Print Occupancy Form  12/28/2011 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  12/13/2011  
Print Occupancy Form  12/9/2011 DONE
DetailsTisha Gallop
Permit Ready to Issue  12/9/2011 DONE
Telephone call  12/9/2011  
12-9-11 called left message for John permikt ready and fee given ,Also asked hin to call to verify owner ///dld
Routing - PLAN CHECK12/8/2011 12/8/2011 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/8/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/8/2011 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)  12/8/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK11/22/2011 11/30/2011 FAIL
DetailsTim L. Woodard
1st review completed  11/30/2011 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS11/21/2011 11/22/2011 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating11/22/2011 11/22/2011 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  11/21/2011 DONE
DetailsChristina Prado
Intake Approval  11/21/2011 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  11/21/2011 DONE
DetailsChristina Prado
Routing - Addressing11/21/2011 11/21/2011 PASS
DetailsTerry Records
Application received 11/21/2011