(F) Reprint permit | | | 1/8/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Framing/Rough-in | 8/7/2012 | 8/7/2012 | 8/8/2012 | P | PART |
Jim Sly
|
|
|
Jp Phone #: ###-#### OK to cover All of 1hr wall except around restrooms.
|
BLD-Framing/Rough-in | 7/31/2012 | 8/1/2012 | 8/1/2012 | A | PART |
Jim Sly
|
|
|
JD Phone #: ###-#### OK to cover select walls 1 side.
|
BLD-Framing/Rough-in | 1/26/2012 | 1/27/2012 | 1/27/2012 | A | PART |
Jim Sly
|
|
|
please call Craig Levit and the above number.
Thanks, Nate Hutton Phone #: ###-#### >> Inspection requested via web by nate hutton Fireblock in Exterior columns ....OK.
|
BLD-Framing/Rough-in | 1/23/2012 | 1/23/2012 | 1/23/2012 | P | PART |
Jim Sly
|
|
|
Dusty Phone #: ###-#### Exterior column framing....OK. Need to see fireblock before total cover.
|
Issue PAID IN FULL permit | | | 1/11/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 11/25/2011 | | 12/29/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 12/15/2011 | | 12/29/2011 | | PASS |
Tim L. Woodard
|
|
|
Refer to report for clarifications and redlines. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 12/29/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 12/29/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/29/2011 | | |
|
|
|
|
Telephone call | | | 12/29/2011 | | |
|
|
|
12-29-11 called Scott left message permit ready and fee given ///dld
|
Plan resubmittals received | | | 12/22/2011 | | DONE |
Tisha Gallop
|
|
|
received response and two copies of plan sheets A1.2, A3.1, A7.1, S1.1, S5.2, A6.1, A10.1, A8.1, A4.1, A4.2, E2.0L; taken to Tim Woodard.
|
Routing - FIRE | 12/13/2011 | | 12/15/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 12/15/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - Erosion and Sediment | 12/13/2011 | | 12/13/2011 | | PASS |
Tim L. Woodard
|
|
|
Waiver letter approved. Applicant must comply with the attached conditions. TLW
|
Routing - PLAN CHECK | | | 12/13/2011 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report, attached to this case. TLW
|
Routing - PUBLIC WORKS | 11/23/2011 | | 11/25/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 11/23/2011 | | 11/25/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/23/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/23/2011 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/23/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 11/23/2011 | | 11/23/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 11/23/2011 | | | |
|
|
|
|