Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-02875
StatusFinaled
Name EXTERIOR CONCEPTS LLC
Site Address 216 W JEFFERSON ST
Project NameCAMP RAINBOW GOLD
Customer Number 
ePlanReviewNo
Description
(CAMP RAINBOW GOLD - HOUSE CONVERSION) (CUP11-00010, CVA11-00143, and CZC11-00143) This building does not have a fire sprinkler system. To convert an existing 3,238 square foot house (557 square foot basement, 1,397 square foot 1st story, and 1,284 square foot 2nd story) to an office. The entire building is being converted. The residential use is required to be abandoned. Work is to include a restroom accessible to the disabled, a van accessible parking space, an exterior wood ramp accessible to the disabled, interior nonbearing walls, and an interior door. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/12/2014 DONE
DetailsChristina Prado
Second Notice 2/6/20143/5/2014 DONE
Mailed 3-5-14
First Notice 1/6/20141/27/2014 DONE
BLD-Final12/27/201312/27/201312/27/2013PPASS
DetailsDave Hannah
Please call prior to inspeciton Nancy Phone #: ###-####
Permanent Occupancy  12/27/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection12/23/201312/26/201312/26/2013APASS
DetailsForrest France
Refer to inspection activity notes dated 11/25.
BLD-Conference12/23/201312/24/201312/26/2013APEND
DetailsDave Hannah
jerome Phone #: ###-####
Print Occupancy Form  12/23/2013 DONE
DetailsChristina Prado
BLD-Final12/13/201312/16/201312/17/2013AFAIL
DetailsDave Hannah
Jerome Edwards Phone #: ###-#### hand rails on ext stairs door hardware and signage ada restroom door hardware upstairs exiting
Case Summary (BLD)  12/11/2013 DONE
DetailsTisha Gallop
BLD-Final11/26/201311/27/201311/27/2013ANR
DetailsTom Arcoraci
call before -- Jerome Phone #: ###-#### needs complete plans and docs,ada bath not per plan other items no inspection at this time
Zoning Approval11/27/201311/27/201311/27/2013 DONE
DetailsAndrea Tuning
FIRE-Final Inspection11/22/201311/25/201311/25/2013PPASS
DetailsForrest France
Life safety passed pending current certifications for fire extinguishers, approved door hardware at the ADA restroom.
Inspection Record Card- Bld  11/22/2013 DONE
DetailsChristina Prado
Case Summary (BLD)  9/20/2013 DONE
BLD - Request for Extension5/31/20135/31/20135/31/2013PPART
DetailsDave Hannah
Nancy Phone #: ###-#### ada ramp ok
BLD-Conference4/12/20134/15/20134/17/2013PPART
DetailsDave Hannah
Nancy-Please call at least 30 mins prior to insepction Phone #: ###-#### crew has started working on project. working o n ada restroom
BLD-Other3/8/20133/11/20133/12/2013APEND
DetailsDave Hannah
Check status of job? not work done todate.
BLD-Conference10/31/201211/2/201211/6/2012PDONE
DetailsDave Hannah
Status? Work started? no work started at this time talked with occ of office they will contact owner of house
BLD-Conference8/24/20128/24/20128/30/2012PDONE
DetailsJim Sly
Status?..........Sign in front yard reads Neal - Colborn Attorneys at law . Gannon Law Office. Asked gal at front desk......Do you have a C of O? She didn't know. Grabbed cards of Attorneys.........Here are thier tele #'s Gary Neal ###-#### cdc-eica James Colborn ###-#### cdc-eica Call for decoding. Jim Sly.
Issue PAID IN FULL permit  5/18/2012 DONE
Expiration Notice5/9/20125/31/20125/9/2012 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  4/10/2012 DONE
Print Occupancy Form  4/10/2012 DONE
Telephone call  4/10/2012 DONE
DetailsChristina Prado
Called and gave Peter fees due and advised GC/RCE is required prior to issuance
Permit Ready to Issue  4/10/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK12/23/2011 4/10/2012 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Plan assigned to (CJW)12/2/2011 4/10/2012 PASS
DetailsCarl Westfall
JEFFERSON LAW OFFICE (20 days - Dec 28)
Plan resubmittals received  4/6/2012  
Received cover transmittal letter, copy of plan review report dated 12-23-11, 3 copies of letter from Stapley Engeneering dated 4-5-12, 2 copies of sheets A-1.1, A1.2, A1.3, and taken to Carl Westfall's desk
Route to Impact Fee Review12/9/201112/14/20111/6/2012 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK12/9/2011 12/23/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on December 20, 2011 and finished on December 23, 2011. Revised drawings were required. See the plan review report.
1st review completed  12/23/2011 DONE
Failed Building.
Routing - PLANNING12/23/2011 12/23/2011 PASS
DetailsSusan Riggs
Susan Riggs - CUP11-00010 & CVA11-00143
Routing - Design Review  12/23/2011 PASS
DetailsAndrea Tuning
Andrea Tuning - CZC11-00143
Routing - FIRE12/9/2011 12/9/2011 PASS
DetailsScott Arellano
No comments attached.
Routing - Erosion and Sediment12/6/2011 12/9/2011 CANC
DetailsClint A Smith
NO ESC permit required.
Routing PW Drainage12/5/2011 12/6/2011 PASS
DetailsBrian Murphy
Routing PW Sewer Rating12/6/2011 12/6/2011 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB12/1/2011 12/2/2011 DONE
DetailsJason Blais
Plan Reviewer's activity  12/2/2011 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD for evaluation of any impact fees due. Our Permit Counter will need written verification from ACHD prior to the building permit being issued.
Routing - Addressing12/2/2011 12/2/2011 PASS
DetailsTerry Records
Application received 12/1/201112/1/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  12/1/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  12/1/2011 DONE
DetailsBarbara Stitt
Intake Approval  12/1/2011 PASS
DetailsDan Stuart