Third Notice | | 3/7/2012 | 3/5/2012 | | DONE |
|
|
|
|
Second Notice | | 2/26/2012 | 3/2/2012 | | DONE |
Christina Prado
|
|
|
mailed 3/2/12
|
First Notice | | 2/10/2012 | 2/16/2012 | | DONE |
|
|
|
|
BLD-Final | 1/31/2012 | 1/31/2012 | 1/31/2012 | P | PASS |
Dave Hannah
|
|
|
Elizabeth Young Phone #: ###-####
|
Permanent Occupancy | | | 1/31/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/30/2012 | 1/30/2012 | 1/30/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. An additional fire extinguisher is required on the second floor. Per Elizabeth the fire extinguisher would be installed prior to the building inspector sign off.
|
Issue PAID IN FULL permit | | | 12/15/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 12/6/2011 | | 12/13/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 12/6/2011 | | 12/13/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 12/13/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 12/13/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 12/13/2011 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2011 | | DONE |
Christina Prado
|
|
|
Called and gave Elizabeth fees due and advised Gc was required. Stated work to be done by her, advised of process
|
Permit Ready to Issue | | | 12/13/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 12/6/2011 | 12/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/6/2011 | | DONE |
Tisha Gallop
|
|
|
|