Second Notice | | 3/12/2012 | 3/15/2012 | | DONE |
Christina Prado
|
|
|
Mailed 3-15
|
First Notice | 2/23/2012 | 2/23/2012 | 3/2/2012 | | DONE |
Jim Storey
|
|
|
mailed 3/2/12
|
BLD-Final | 2/22/2012 | 2/23/2012 | 2/23/2012 | A | PASS |
Jim Storey
|
|
|
After 10 AM --- Rich Phone #: ###-####
|
DOC - Permit Finaled | 2/23/2012 | 2/23/2012 | 2/23/2012 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 2/22/2012 | 2/22/2012 | 2/22/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 2/21/2012 | 2/22/2012 | 2/22/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide occupant load sign and annual inspection for the fire extinguishers.
|
BLD-Framing/Rough-in | 1/12/2012 | 1/13/2012 | 1/13/2012 | A | PASS |
Tom Arcoraci
|
|
|
call before//Rich Phone #: ###-####
|
BLD-Framing/Rough-in | 12/29/2011 | 12/29/2011 | 12/29/2011 | P | FAIL |
Tony Young
|
|
|
rich Phone #: ###-####,, c/n posted,, needs electrical permit,, and plans
|
Issue PAID IN FULL permit | | | 12/19/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/16/2011 | | DONE |
|
|
|
left vm for richard - re: need updated cert of value
|
Print Occupancy Form | | | 12/16/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 12/7/2011 | | 12/15/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 12/7/2011 | | 12/15/2011 | | PASS |
Tim L. Woodard
|
|
|
Added multiple redlines to drawings for clarification. Also added General notes in the Plan Review Report for exterior covering information. Tim Woodard
|
1st review completed | | | 12/15/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 12/15/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 12/15/2011 | | DONE |
|
|
|
left vm for richard - re: need updated cert of value
|
Application received | | 12/7/2011 | 12/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 12/7/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/7/2011 | | DONE |
Barbara Stitt
|
|
|
|