(SUBWAY – Capitol Terrace Bldg) Permit is remodel an existing 1,846 sq ft restaurant tenant space into a new restaurant tenant space. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing non-combustable walls, new equipment, new furnishing, [plumbing, mechanical, and electrical modifications], and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Application received 12/9/201112/14/2012 DONE
DetailsTisha Gallop
received 12/14/12
Third Follow up  10/16/2012 DONE
DetailsTisha Gallop
on hold
Third Notice 9/1/20129/25/2012 DONE
mailed to GC with letter due date 10/6
Third Notice 8/14/20128/27/2012 DONE
faxed and mailed
Third Notice 7/20/20127/30/2012 DONE
faxed to GC
Third Notice 6/12/20127/6/2012 DONE
mailed
Second Notice 5/26/20126/7/2012 DONE
First Notice 4/20/20125/16/2012 DONE
BLD-Final4/10/20124/10/20124/10/2012PPASS
DetailsTom Arcoraci
For final occupancy
Permanent Occupancy  4/10/2012 DONE
DetailsChristina Prado
BLD-Final4/9/20124/9/20124/9/2012PPART
DetailsDave Hannah
as discussed last week. cdhd is at 3 pm. Phone #: ###-#### >> Inspection requested via web by John Lodman OK FOR TEMP OK FOR PERM OCC AFTER PLUMBING AND CDHD FINALS
BLD-Final4/8/20124/9/20124/9/2012ADEFR
DetailsDave Hannah
as discussed last week. cdhd is at 3 pm. Phone #: ###-#### >> Inspection requested via web by John Lodman CHANGED TO PM
BLD-Final4/6/20124/6/20124/9/2012APART
DetailsDave Hannah
please review pending CDHD signoff on Tuesday. all other permits are final.needs occ load sign and cdhd sign off

thank you. Phone #: ###-#### >> Inspection requested via web by John Lodman
FIRE-Final Inspection4/5/20124/5/20124/5/2012PPASS
DetailsForrest France
Fire life safety inspection passed.
FIRE-Sprinkler Rough-in3/12/20123/12/20123/12/2012APART
DetailsForrest France
Painted upright sprinklers to be replaced prior to final as discussed.
BLD-Other3/6/20123/6/20123/7/2012PPART
DetailsJim Storey
ceiling cover and look at soffit revisions please. Phone #: ###-#### >> Inspection requested via web by John Lodman ok to drop ceilling/ need to have acht. submit soffit drawing to plan reiview for aproval.
FIRE-Conference2/22/20122/22/20122/22/2012PDONE
DetailsTroy Cobbley
Conference for emergency lights. I was ok with deleting the emergency light in the center of the seating area since there will be lights at both the front and rear exit doors in the seating area.
BLD-Wall cover2/6/20122/6/20122/6/2012APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by John Lodman ok to cover soffits after engineer oks the change to framming of soffit
FIRE-Conference1/6/20121/6/20121/6/2012PDONE
DetailsForrest France
Regarding permit required for modifications to the existing fire alarm system.
FIRE-Conference12/28/201112/29/201112/29/2011ADONE
DetailsForrest France
conference to discuss FA requirements. 8:30 am requested.

Phone #: ###-#### >> Inspection requested via web by John Lodman
Print Occupancy Form  12/28/2011 DONE
Issue PAID IN FULL permit  12/28/2011 DONE
DetailsRita DeYoung
Permit Ready to Issue  12/28/2011 DONE
DetailsRita DeYoung
CHANGE STATUS TO (ISS)  12/28/2011 DONE
DetailsRita DeYoung
1st review completed  12/23/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/23/2011 DONE
DetailsTim L. Woodard
Routing - PLUMBING12/23/2011 12/23/2011 PASS
DetailsDaryl Spivey
Signed off by Daryl in E-Plan Review. TLW
Plan assigned to (TLW)12/23/2011 12/23/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK12/23/2011 12/23/2011 PASS
DetailsTim L. Woodard
Routing - Addressing12/16/2011 12/16/2011 PASS
DetailsApril Wing
Routing PW Sewer Rating12/14/2011 12/14/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS12/14/2011 12/14/2011 PASS
DetailsBeverly Mountain
Issue PAID IN FULL permit  12/13/2011 DONE
Payment received via Govolutions
CHANGE STATUS TO (REV)  12/13/2011 DONE
DetailsChristina Prado
Govolution issued permit
Telephone call  12/13/2011 DONE
DetailsTisha Gallop
e-mailed Stan Cole permit accepted, need to pay plan check fees.