BLD-Energy code compliance | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PASS |
Dave Hannah
|
|
|
matt please call before goin gout Phone #: ###-####
|
BLD-Energy code compliance | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | PART |
Dave Hannah
|
|
|
Matt-between 10-12-please call prior Phone #: ###-#### seal package ok ok to insulate
|
BLD-Final | 7/9/2013 | 7/10/2013 | 7/11/2013 | P | CANC |
Dave Hannah
|
|
|
Early afternoon - matt Phone #: ###-####
|
BLD-Framing/Rough-in | 7/11/2013 | 7/11/2013 | 7/11/2013 | P | PART |
Dave Hannah
|
|
|
framing is ok but needs to install air seal package and get plumbing r/i
|
Routing Walk-In (BLD) | 4/12/2013 | 4/15/2013 | 4/15/2013 | P | PASS |
Perry Paine
|
|
|
|
Telephone call | | | 4/12/2013 | | DONE |
|
|
|
question ffom the insulation contractor. Allow for best method with existing construction. GEOTHERMAL
|
Routing - MECHANICAL | 1/7/2013 | | 1/7/2013 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (BLD) | 9/4/2012 | 9/4/2012 | 9/4/2012 | A | PASS |
Perry Paine
|
|
|
ok to add closet to this permit. see approved resuvbmittal
|
BLD-Framing/Rough-in | 5/29/2012 | 6/5/2012 | 6/5/2012 | P | NR |
Dave Hannah
|
|
|
Please call ahead for access -- matt Phone #: ###-#### needs other rough ins first
|
Routing Walk-In (BLD) | 3/15/2012 | 3/15/2012 | 3/19/2012 | P | PASS |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 12/9/2011 | 12/9/2011 | 12/9/2011 | | PASS |
Perry Paine
|
|
|
|
Application received | | 12/9/2011 | 12/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 12/9/2011 | 12/9/2011 | 12/9/2011 | P | PASS |
Sarah Schafer
|
|
|
Approved per DRH11-00230.
|
Routing Walk-In (BLD) | 12/9/2011 | 12/9/2011 | 12/9/2011 | P | FAIL |
Perry Paine
|
|
|
floor plan required
|
Routing Walk-In (BLD) | 12/9/2011 | 12/9/2011 | 12/9/2011 | P | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 12/9/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/9/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 12/9/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/9/2011 | | |
|
|
|
|
1st review completed | | | 12/9/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/9/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/9/2011 | | DONE |
Christina Prado
|
|
|
|