Third Notice | | 12/2/2013 | 12/12/2013 | | DONE |
|
|
|
|
Second Notice | | 11/10/2013 | 11/27/2013 | | DONE |
|
|
|
|
First Notice | 10/1/2013 | 10/1/2013 | 10/31/2013 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 9/30/2013 | 10/1/2013 | 10/1/2013 | P | PASS |
Jim Sly
|
|
|
jeff Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2013 | 10/1/2013 | 10/1/2013 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/30/2013 | 10/1/2013 | 10/1/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Meeting | | | 3/2/2012 | | DONE |
|
|
|
Per the Fire Code Official; the irregular voltage readings identified on the secondary energy source shall not prohibit this alarm inspection from being approved for occupancy. *SJA*
|
BLD-Final | 2/9/2012 | 2/9/2012 | 2/9/2012 | P | PART |
Jim Sly
|
|
|
Jason This is for a temp final -pending fire alarm final Phone #: ###-#### Temp Occ. OK Need Fire Final for Perm Occ.
|
FIRE-Final Inspection | 2/8/2012 | 2/9/2012 | 2/9/2012 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Romeo Gervais permission until the fire alarm system has been addressed.
|
FIRE-Alarm Testing | 1/19/2012 | 1/20/2012 | 1/20/2012 | A | DONE |
Troy Cobbley
|
|
|
This was a pre-inspection for the fire alarm scope of work. It appears the device spacing is adequate. I discussed the need for EOL voltage verification.
|
BLD-Framing/Rough-in | 1/4/2012 | 1/5/2012 | 1/6/2012 | A | PASS |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/27/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2011 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2011 | | DONE |
Christina Prado
|
|
|
Called and gave John fees due
|
Permit Ready to Issue | | | 12/21/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 12/16/2011 | 12/16/2011 | 12/20/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - FIRE | 12/19/2011 | | 12/20/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 12/20/2011 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/20/2011 | | 12/20/2011 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2011 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/19/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 12/19/2011 | | |
|
|
|
|
Routing - PLAN CHECK | 12/16/2011 | | 12/19/2011 | | PASS |
Dan Stuart
|
|
|
Routing to fire code analyst for review.
|
Application received | | 12/16/2011 | 12/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/16/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/16/2011 | | DONE |
Tisha Gallop
|
|
|
|