Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD11-02974
StatusFinaled
Name STEINER CONSTRUCTION SERVICES INC
Site Address 542 N MILWAUKEE ST
Project NameBOISE TOWN PLAZA
Customer Number 
ePlanReviewYes
Description
(BOISE TOWN PLAZA) Remodel to subdivide an existing 39,979 sq. ft. retail space into two separate "vanilla finish" spaces (vacant) for future tenants per approved plans. The new West tenant space will include 24,597 square feet. The new East tenant space will include 12,354 square feet. The new common receiving corridor will include 2,028 square feet. Inerior demolition work permit under BLD12-00106. Work to include: Demolition work per plans; Install new storefront glazing and entrance on the West tenant space side; cut new openings in the existing roof for three new RTU's; New one-hour rated tenant demising wall; new one-hour common exit corridor walls; new interior walls and doors; new suspended ceiling on one area; new plumbing work, new mechanical work, and new electrical work; new exterior concrete sidewalk and curb per plans; trench existing floor slab for new utilities; infill existing CMU exterior wall openings per plans; relocate existing fire protection/alarm panel to fire sprinkler room per plans; and all other work per the approved plans, engineering, attached plan review report, and all applicable adopted codes. "This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. This is a Scope of Work Permit. A certificate of completion shall be issued when work is completed and a final inspection has occurred. Planning approval done under DRH11-00282. NOTE: Special inspections are required. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/22/20126/6/2012 DONE
DetailsChristina Prado
Second Notice 4/26/20125/17/2012 DONE
First Notice4/12/20124/12/20124/16/2012 DONE
DetailsMike Jordan
SENT BY MAIL
BLD-Final4/11/20124/12/20124/12/2012APASS
DetailsMike Jordan
Chris Phone #: ###-####
DOC - Permit Finaled4/12/20124/12/20124/12/2012PPASS
DetailsMike Jordan
Certificate of completion issued.
Zoning Approval4/11/20124/11/20124/11/2012 DONE
DetailsAndrea Tuning
BLD-Final4/9/20124/10/20124/10/2012AFAIL
DetailsMike Jordan
Chris Phone #: ###-####. Needs zoning and mechanical finals. Needs to complete firestopping for electrical conduits for 1hr. fire wall.
FIRE-Final Inspection4/5/20124/6/20124/9/2012ADONE
DetailsForrest France
FIRE-Final Inspection4/9/20124/9/20124/9/2012PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection4/6/20124/9/20124/9/2012AFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire alarm permit is addressed. Rescheduled for 3:00pm
BLD-Final4/6/20124/6/20124/6/2012PNR
DetailsMike Jordan
CHRIS Phone #: ###-####
BLD-Framing/Rough-in3/26/20123/27/20123/27/2012PPART
DetailsDave Hannah
Chris Phone #: ###-#### ext soffit ok to cover
BLD-Framing/Rough-in3/12/20123/12/20123/12/2012PPASS
DetailsMike Jordan
chris Phone #: ###-####. Ok to cover storefront.
FIRE-Conference3/12/20123/12/20123/12/2012PDONE
DetailsTroy Cobbley
Mike Jordan and I verified that the existing plywood sheating, at the store front, is indeed fire rated.
FIRE-Conference3/9/20123/9/20123/9/2012PDONE
DetailsTroy Cobbley
I met Mike Jordan and the building superintendant and discussed the apparent combustible concealed space at the main entry. New sheating being installed is fire rated but the existing sheating appears not to be fire rated. Therefore sprinkler protection will be required or meeting one of the exceptions in chapter 8 of NFPA 13.
BLD-Framing/Rough-in3/8/20123/9/20123/9/2012ANR
DetailsMike Jordan
chris Phone #: ###-####. Framing inspection for storefront. HAd Fire inspector Troy C. also at jobsite for conferance regarding the combustible material that will be enclosed within storefront. Contractor to recall dframing inspection when fire issues have been resolved.
BLD-Framing/Rough-in3/5/20123/5/20123/5/2012PPART
DetailsMike Jordan
CHRIS Phone #: ###-####. 5/8 type x rock attachment for 1hr. fire walls.
BLD-Framing/Rough-in2/27/20122/28/20122/28/2012APASS
DetailsMike Jordan
chris Phone #: ###-####. Remainder of rated demissing wall ok.
BLD-Framing/Rough-in2/22/20122/23/20122/23/2012APART
DetailsJim Sly
chris Phone #: ###-####
OK'd framing (only) at West wall, and North wall. North wall extends from West wall to East wall. Walls do not include the firestopping any penitrations or tops of 1hr walls. Advised contractor to contact architect for UL listed tested assembly for tops of walls and penitrations. (no details on plan) The other issue to be resolved by architect is that the North wall bisects the smoke evacuation system located at roof.
Issue PAID IN FULL permit  2/8/2012 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  2/8/2012 DONE
DetailsTisha Gallop
Telephone call  2/7/2012 DONE
DetailsChristina Prado
Called and gave Mike fees due. Also advised RP is required prior to issuance
Permit Ready to Issue  2/7/2012 DONE
DetailsChristina Prado
Plan assigned to (SRZ)1/12/20121/12/20122/2/2012 PASS
DetailsSam Zahorka
ePlanReview case (2-9-12)
1st review completed.
Routing - PLUMBING1/12/2012 2/2/2012 PASS
DetailsBill VanDegrift
Routing - FIRE2/1/2012 2/2/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
Route to Impact Fee Review2/1/2012 2/2/2012 PASS
DetailsCindy M. Gould
Please sign-off within eForm. Check the box for yourself and click "complete review".
Routing - PLAN CHECK2/1/2012 2/2/2012 PASS
DetailsSam Zahorka
Routing - PLAN CHECK2/2/2012 2/2/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  2/2/2012 DONE
DetailsSam Zahorka
1st review completed  1/30/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK1/12/2012 1/30/2012 FAIL
DetailsSam Zahorka
Corrections needed. See changemarks in ePlanReview. I also contacted the Architect and explained corrections.
Plan Reviewer's activity  1/23/2012 DONE
DetailsScott Arellano
Emailed Fire Code plan review report to Juan Castillo.
Routing - FIRE1/12/2012 1/17/2012 FAIL
DetailsScott Arellano
Corrections required within E-plan review.
Routing - PUBLIC WORKS1/12/2012 1/13/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing1/12/2012 1/13/2012 PASS
DetailsApril Wing
Routing PW Sewer Rating1/13/2012 1/13/2012 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment1/12/2012 1/13/2012 PASS
DetailsSteven Webb
ESC plan waiver approved according to the permits attached conditions.
Issue PAID IN FULL permit  1/12/2012 DONE
Payment received via Govolutions
Route to Impact Fee Review1/12/20121/17/20121/12/2012 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - Design Review1/12/2012 1/12/2012 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH11-00282
Pending Assignment by JCB1/12/2012 1/12/2012 DONE
DetailsJason Blais
Intake Approval  1/12/2012 PASS
Plan intake approved.
Telephone call  1/12/2012 DONE
DetailsChristina Prado
Sent email to Juan to advise fees are ready to be paid. Email sent through projectdox
Intake Approval  12/20/2011 FAIL
The submittal standards for ePlanReview were not followed. Failed the plan intake review. Needs a complete plan intake review after revised drawings and file names are uploaded. Sent the applicant a copy of the standards. CJW
Application received 12/16/2011