Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-02986
StatusFinaled
Name HORIZON RETAIL CONSTRUCTION INC
Site Address 350 N MILWAUKEE ST Unit: 1143
Project NameBTS - #1143 Coldwater Creek
Customer Number 
ePlanReviewNo
Description
(COLDWATER CREEK – BTS # 1143 – Interior Demo / Partial Permit) This permit is to perform interior non-structural demo work and Partial permit work as outlined within this scope of work only. Scope of work: includes removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, removal of some existing light fixtures, construction to the framing stage including rough-in electrical, plumbing, and mechanical while the plans for the space are being reviewed (Major TI is submitted under BLD11-02578). Any construction not meeting code must be removed prior to framing inspection approval and any further construction being endorsed. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. BCC resolution 13535 11-2-10 **TLW**.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Follow up  7/20/2012 DONE
received 7/31/12
Third Notice 6/20/20127/6/2012 DONE
mailed to GC
Third Notice 5/31/20126/6/2012 DONE
Faxed to GC
Third Notice 4/22/20125/17/2012 DONE
faxed to GC
Second Notice 4/9/20124/17/2012 DONE
First Notice 3/26/20123/30/2012 DONE
faxed to GC
First Notice3/6/20123/6/20123/16/2012 DONE
DetailsMike Jordan
BLD-Final3/2/20123/6/20123/6/2012PPASS
DetailsMike Jordan
>> Inspection requested via web by Chrys Charbonneau
DOC - Permit Finaled3/6/20123/6/20123/6/2012PPASS
DetailsMike Jordan
Override - Parcel Holds  1/4/2012  
Issue PAID IN FULL permit  1/4/2012 DONE
this is for early start permit
Telephone call  12/30/2011 DONE
left vm for paul - permit ready and fees given
Override - Parcel Holds  12/30/2011  
Permit Ready to Issue  12/30/2011 DONE
Details
Plan assigned to (TLW)12/20/2011 12/29/2011 PASS
DetailsTim L. Woodard
Tim Woodard
Routing - PLAN CHECK12/21/2011 12/29/2011 PASS
DetailsTim L. Woodard
Tim Woodard
Intake Approval  12/29/2011 PASS
DetailsTim L. Woodard
Contacted by contractor he will be in on January 3 or 4th to pick up partial permit / demo. I am preparing for issuance now. TLW
1st review completed  12/29/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/29/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/29/2011 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  12/29/2011 DONE
Routing - Addressing12/21/2011 12/21/2011 PASS
DetailsTerry Records
Routing PW Sewer Rating12/21/2011 12/21/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS12/21/2011 12/21/2011 PASS
DetailsConnie Baumgartner
Application received 12/20/201112/20/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  12/20/2011 DONE
DetailsBarbara Stitt
Intake Approval  12/20/2011 FAIL
DetailsTim L. Woodard
Awaiting Contractor to come in and pick up this over the counter.