Third Notice | | 2/24/2013 | 2/28/2013 | | DONE |
|
|
|
|
Second Notice | | 2/7/2013 | 2/19/2013 | | DONE |
Christina Prado
|
|
|
mailed 2-20-13
|
First Notice | | 1/20/2013 | 1/28/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/10/2013 | 1/10/2013 | 1/10/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 1/10/2013 | | DONE |
Tisha Gallop
|
|
|
|
Temporary Occupancy | 1/9/2013 | 4/9/2013 | 1/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | PASS |
Tom Arcoraci
|
|
|
Contact Frank @ ###-####. If Tom has time we are ready this morning. >> Inspection requested via web by Mark Bowen ok for perm occ
|
Extend Permit 90/180 days | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | PASS |
Tom Arcoraci
|
|
|
Contact Frank @ ###-####. If Tom has time we are ready this morning. >> Inspection requested via web by Mark Bowen ok for perm occ
|
BLD-Final | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PART |
Tom Arcoraci
|
|
|
Requesting inspection for temporary occupancy while as-built fire documents are being reviewed. Phone #: ###-#### >> Inspection requested via web by Mark Bowen ok for temp occ
|
FIRE-Final Inspection | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy is approved with Scott Arellano's permission until the fire alarm and fire sprinkler permits have been addressed.
|
BLD-Final | 11/5/2012 | 11/6/2012 | 11/7/2012 | P | NR |
Tom Arcoraci
|
|
|
Ask for Frank Phone #: ###-#### >> Inspection requested via web by Mark Bowen
|
FIRE-Final Inspection | 11/5/2012 | 11/6/2012 | 11/6/2012 | A | FAIL |
Troy Cobbley
|
|
|
Items on the correctio notice have been addressed except for the fire alarm and fire sprinkler permits. I also noted door magnets that have been installed within the past week that are not connected to the fire alarm system as required per IFC 1008.1.4.4.
|
Zoning Approval | 11/2/2012 | 11/2/2012 | 11/2/2012 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 10/28/2012 | 10/29/2012 | 10/29/2012 | P | FAIL |
Troy Cobbley
|
|
|
Project is not ready for final inspection. The sprinkler plans need to be resubmitted. The fire alarm plans need to be resubmitted. I did check the emergency lighting/exit signs per the approved plans and found existing devices non-functional and one new emergency light not installed. Contractor and I discussed the placement of the K type fire extinguisher at the kitchen hood. I also noted an outstanding FIR permit that is in the "ready status" that needs to be addressed.
|
BLD-Framing/Rough-in | 9/28/2012 | 10/1/2012 | 10/1/2012 | A | PASS |
Tom Arcoraci
|
|
|
ceiling grid inspection please-Frank Palmer Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2012 | 8/22/2012 | 8/22/2012 | P | PASS |
Tom Arcoraci
|
|
|
Frank Phone #: ###-####
|
BLD-Framing/Rough-in | 8/6/2012 | 8/7/2012 | 8/7/2012 | A | PASS |
Tom Arcoraci
|
|
|
Phone # is for Frank at the site Phone #: ###-#### >> Inspection requested via web by Mark Bowen
|
BLD-Final | 6/15/2012 | 6/15/2012 | 6/15/2012 | P | PART |
Tom Arcoraci
|
|
|
Frank Phone #: ###-####
|
BLD-Final | 6/15/2012 | 6/15/2012 | 6/15/2012 | A | PART |
Tom Arcoraci
|
|
|
Frank Phone #: ###-#### ok for lab and messinine south side of building,barricade at stair landing will be removed to install equipment
|
FIRE-Final Inspection | 6/14/2012 | 6/15/2012 | 6/15/2012 | A | PART |
Troy Cobbley
|
|
|
The life safety is passed for the mezzanine, first and second floors. Per Jennifer a temporary occupancy is ok without the alarm being installed since the fire alarm system is voluntary and not required.
|
CHANGE STATUS TO (ISS) | | | 6/14/2012 | | DONE |
Barbara Stitt
|
|
|
Issue plan modification
|
(F) Reprint permit | | | 6/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/1/2012 | | DONE |
|
|
|
LM for Mark - plan mod fees changed
|
Print Occupancy Form | | | 5/25/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 5/25/2012 | | DONE |
Tisha Gallop
|
|
|
called Mark Bowen and left vm plan mod is ready and fees.
|
Plan assigned to (CJW) | 5/1/2012 | 5/1/2012 | 5/24/2012 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 5/15/2012 | | 5/24/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved after lateral analysis received.
|
Routing - FIRE | 5/12/2012 | | 5/15/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 5/11/2012 | | 5/12/2012 | | DONE |
Carl Westfall
|
|
|
Took to Fire.
|
Routing - PLUMBING | 5/8/2012 | | 5/11/2012 | | PASS |
Daryl Spivey
|
|
|
1. Need vents on trench drain and floor sink in autoclave prep area.
2. Per plan and 2003 UPC.
|
Routing - PUBLIC WORKS | 5/8/2012 | | 5/8/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 5/8/2012 | | 5/8/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 5/8/2012 | | 5/8/2012 | | DONE |
Carl Westfall
|
|
|
Took to plumbing
|
Routing - PLAN CHECK | 5/2/2012 | | 5/8/2012 | | FAIL |
Carl Westfall
|
|
|
A new lateral structural analysis of the 16 foot tall portion of this building was required because of the additional new exterior window openings and because of the relocated and new skylight openings.
|
BLD-Framing/Rough-in | 5/7/2012 | 5/7/2012 | 5/7/2012 | P | PART |
Tom Arcoraci
|
|
|
south side ok
|
Plan Modification Accepted | | | 5/1/2012 | | |
Alexandra L. DeYoung
|
|
|
Plan mod rec'd for BLD11-03012 (JR Simplot Bio Plant) to revise fllor plan layout of the office space, the first floor and second floor labs will remain the same; submitted on sheets A0.1; AD1.1; A2.1; A2.1A; A2.2; A2.3; A2.4; A3.1; A4.1; A5.1; A6.2; A6.3; A6.4; A7.2; A8.1; MG1.0; MG1.1; M1.1; M2.1; M2.2; M3.1; M4.1; M5.1; M5.2; M6.1; M6.2; P1.1; P1.2; P2.1; P2.2; P3.1; P3.2; P4.1; P5.1; P5.2; EG1.0; E1.1; E2.1; E2.2; E2.3; E3.1; E3.2; E3.3; E4.1; E5.1; E5.2; E5.3; E5.4; and revised cert of value - rounted to Carl W.
|
BLD-Framing/Rough-in | 3/8/2012 | 3/8/2012 | 3/8/2012 | P | PASS |
Tom Arcoraci
|
|
|
partial framing//Frank Palmer Phone #: ###-####
|
BLD-Foundation | 3/8/2012 | 3/8/2012 | 3/8/2012 | P | PASS |
Tom Arcoraci
|
|
|
Frank Palmer Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/8/2012 | | DONE |
Tisha Gallop
|
|
|
paid and picked up approved plan mod
|
Plan assigned to (CJW) | 2/17/2012 | 2/17/2012 | 2/22/2012 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 2/17/2012 | | 2/22/2012 | | PASS |
Carl Westfall
|
|
|
Plan modification approved.
|
Print Occupancy Form | | | 2/22/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/22/2012 | | DONE |
Barbara Stitt
|
|
|
Spoke with Lillian in Mark Bowen's office and told her that permit is ready & fees due on 2-22-12 @ 3:15pm//BAS
|
Plan Modification Accepted | | | 2/17/2012 | | |
|
|
|
Plan modification accepted for utilizing the opening in the CMU wall instead of the opening that was to be cut in the original permit drawings. This changes the path of egress and structural framing plan. The change will be clearly delineated through the storage room. Phase 2 of the project which is scheduled in the next year will add an additional rated stair for eggress from the second story lab. Submitted 2 sets of sheets A0.1, A2.1, A2.2, A3.1, A6.2, A7.1, S1.1, S2.2-No change in value.
|
Issue PAID IN FULL permit | | | 2/1/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 1/27/2012 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Mark Bowen that fees have changed due to Public works change on 1-27-12 @ 10:40am//BAS
|
Telephone call | | | 1/25/2012 | | DONE |
Tisha Gallop
|
|
|
called Mark Bowen and left vm new fee total because Bench swr fees were adjusted.
|
Telephone call | | | 1/20/2012 | | DONE |
|
|
|
left vm for mark - permit ready and fees given - also need RP name and ACHD receipt - also let him know that there are final value fees due on Bld11-00390 that will need to be paid prior to picking up this permit
|
Permit Ready to Issue | | | 1/20/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/19/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/19/2012 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/27/2011 | | 1/19/2012 | | PASS |
Carl Westfall
|
|
|
SIMPLOT - BIO LAB (20 days - January 19)
|
Routing - PLAN CHECK | 1/17/2012 | | 1/19/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 1/18/2012 | | |
|
|
|
1-18-12 receied 2 response, 2 supplemental structural calcs, & 2 copies of sheets A0.1,A0.3,A5.1,A6.1,A6.2,S2.1 sent to Carl W.
|
Routing - FIRE | 1/12/2012 | 1/12/2012 | 1/17/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 1/17/2012 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 1/12/2012 | 1/17/2012 | 1/12/2012 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement to an existing building sq footage of shell is not increasing. No impact fees
|
Routing - PLAN CHECK | 1/4/2012 | | 1/12/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Jan 4 and completed on Jan 12. Revised draiwngs were requried. See the plan review report.
|
Routing - Design Review | 1/3/2012 | | 1/4/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH11-00257
|
Routing - PLUMBING | 12/29/2011 | | 1/3/2012 | | PASS |
Bill VanDegrift
|
|
|
Per plans and 2003 UPC.
|
Routing - Erosion and Sediment | 12/28/2011 | | 12/29/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00900 plan approved with conditions attached to the permit.
|
Routing PW Sewer Rating | 12/28/2011 | | 12/28/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 12/27/2011 | | 12/28/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 12/27/2011 | | 12/27/2011 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 12/23/2011 | | 12/27/2011 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 12/23/2011 | | PASS |
|
|
|
OK to submit for permit.
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/23/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 12/23/2011 | | | |
|
|
|
|