Print Statement | | | 10/10/2013 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 9/9/2013 | 10/2/2013 | | DONE |
Christina Prado
|
|
|
mailed 10-3-13
|
Permanent Occupancy | | | 8/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 6/6/2013 | 6/7/2013 | 6/7/2013 | P | PASS |
Tom Arcoraci
|
|
|
Tom, the electrical inspector has signed off temp. and hopefully he will get here before you do. Otherwise all set. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
FIRE-Final Inspection | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 6/4/2013 | 6/6/2013 | 6/6/2013 | P | FAIL |
Troy Cobbley
|
|
|
Fire Life and safety can ve passed when the project related fire alarm and fire sprinkler permits have been addressed.
|
Zoning Approval | 5/9/2013 | 5/9/2013 | 5/9/2013 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Ceiling Grid Inspection | 4/10/2013 | 4/11/2013 | 4/11/2013 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Conference | 3/13/2013 | 3/13/2013 | 3/13/2013 | P | CANC |
Tom Arcoraci
|
|
|
Tom, I had one more thing for you to look at. If you are close it will only take a few minutes. Just come to the gate and drive in. Thanks Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Framing/Rough-in | 3/12/2013 | 3/12/2013 | 3/12/2013 | P | PASS |
Tom Arcoraci
|
|
|
Tom, I need a ceiling rough in inspection.
Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 2/11/2013 | 2/12/2013 | 2/12/2013 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 2/11/2013 | 2/11/2013 | 2/12/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Ceiling Grid Inspection | 1/28/2013 | 1/29/2013 | 1/29/2013 | P | PASS |
Tom Arcoraci
|
|
|
Tom, I need a ceiling inspection for fat grid. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Concrete | 1/10/2013 | 1/10/2013 | 1/11/2013 | P | PASS |
Tom Arcoraci
|
|
|
rebar is in place for remaining mezz. slab. Strata will inspect and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Concrete | 1/3/2013 | 1/4/2013 | 1/4/2013 | P | PASS |
Tom Arcoraci
|
|
|
Tom, we are placing concrete for the mezz. floor. Strata will be onsite for rebar inspection as well as concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Conference | 12/12/2012 | 12/12/2012 | 12/12/2012 | P | PASS |
Jim Storey
|
|
|
Tom, I have got a couple of things I want you to take a look at. This should not take up much of your time. Thanks Phone #: ###-#### >> Inspection requested via web by Gary Simon stair head height ok at guard station access.
|
Routing - PLAN CHECK | 10/10/2012 | | 10/17/2012 | | PASS |
Carl Westfall
|
|
|
The Architect uploaded new sheets for the cell construction. The new drawings are identical to the ones uploaded by Carl Westfall except that the Project Structural Engineer had stamped them to show that he had reviewed them. Deferred submittals were apprved through ePlanReview.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/17/2012 | | DONE |
Tisha Gallop
|
|
|
Per Carl Westfall no fees due for deferred submittals.
|
Routing - PLAN CHECK | 9/27/2012 | | 10/3/2012 | | DONE |
Carl Westfall
|
|
|
This is a deferred submittal review. Drawings were uploaded by the Plans Examiner for the Architect. Reviewed the deferred submittal. Asked Barb to start a plan modification work flow (even though it is not a plan mod).
|
BLD-Other | 9/26/2012 | 9/27/2012 | 9/27/2012 | P | PASS |
Tom Arcoraci
|
|
|
Cmu inspection. 1:00pm Strata will be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
Plan resubmittals received | | | 9/27/2012 | | DONE |
|
|
|
Deferred submittal for the cells were submitted.
|
BLD-Other | 9/19/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Tom Arcoraci
|
|
|
grout cmu at various hgts. at noon. Strata to inspect rebar and observe grouting. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Concrete | 9/19/2012 | 9/20/2012 | 9/20/2012 | A | PASS |
Tom Arcoraci
|
|
|
Place concrete slab for Alt. # 2 area. Strata to inspect rebar and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 9/13/2012 | 9/14/2012 | 9/14/2012 | P | PASS |
Tom Arcoraci
|
|
|
Grouting cmu walls at 4, 8, and 12 feet. Strata will be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 9/6/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Dave Hannah
|
|
|
Concrete for footings and stemwall for alternate# 2. Strata to inspect rebar and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Other | 9/6/2012 | 9/7/2012 | 9/7/2012 | A | PASS |
Dave Hannah
|
|
|
Grout interior cmu walls @ 4''. Strata to inspect rebar. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Concrete | 8/27/2012 | 8/28/2012 | 8/28/2012 | A | PASS |
Tom Arcoraci
|
|
|
Tom, we are placing the concrete for the remaining slab tomorrow at 5:00am. Strata will look at the rebar mat, vapor barrier today and test the concrete tomorrow. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | PASS |
Tom Arcoraci
|
|
|
Strata will be onsite for rebar inspection and concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Concrete | 8/16/2012 | 8/17/2012 | 8/17/2012 | A | PASS |
Tom Arcoraci
|
|
|
Inspect vapor barrier and rebar mat for slab. Strata will inspect vapor and rebar today and test concrete monday am. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Foundation | 8/8/2012 | 8/8/2012 | 8/8/2012 | P | PASS |
Tom Arcoraci
|
|
|
Tom, we are pouring the 12" stemwalls on the ftgs. Strata will be onsite for rebar and concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Footing | 8/6/2012 | 8/7/2012 | 8/7/2012 | P | PASS |
Tom Arcoraci
|
|
|
Tom,we are placing concrete in interior footings late afternoon. Strada will be onsite to inspect the rebar and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
BLD-Foundation | 7/12/2012 | 7/16/2012 | 7/16/2012 | A | PASS |
Tom Arcoraci
|
|
|
We are pouring foundation walls starting at 6:00am Monday morning. Strata is doing all rebar inspections. if you would like you could come by tomorrow and look at everything its all set up now.
MB >> Inspection requested via web by Mike Burden
|
BLD-Footing | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PASS |
Tom Arcoraci
|
|
|
We are planning on pouring at 2:00 PM you can call me on my cell when you get here and i will get you in it the far east entry there is a little guard shack outside the gate. Phone #: ###-#### >> Inspection requested via web by Mike Burden
|
Issue PAID IN FULL permit | | | 6/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 6/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/5/2012 | | DONE |
|
|
|
emailed gc fees due
|
Permit Ready to Issue | | | 6/5/2012 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/22/2012 | 3/22/2012 | 4/20/2012 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 4/19/2012 | | 4/20/2012 | | PASS |
Carl Westfall
|
|
|
Finished plan processing.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2012 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2012 | | DONE |
Tisha Gallop
|
|
|
e-mailed Russel plans approved and have GC contact permit desk for issuance
|
Routing - PLAN CHECK | 4/11/2012 | | 4/19/2012 | | PASS |
Carl Westfall
|
|
|
Revised drawings were not uploaded until April 11. Reviewed all revised drawings.
|
Routing - PLUMBING | 4/19/2012 | | 4/19/2012 | | PASS |
Bill VanDegrift
|
|
|
Verify changes between V1 to V3 to Sheets P1.0, P1.1, and P1.2 (actual numbers on sheets are M1.0, M1.1, and M1.2)
|
CHANGE STATUS TO (REV) | | | 3/22/2012 | | DONE |
|
|
|
Revised drawings being submitted in ePlanReview.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2012 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/4/2012 | | 2/28/2012 | | PASS |
Carl Westfall
|
|
|
ADA COUNTY JAIL (20 days - Jan. 31) ePlanReview
|
Routing - PLAN CHECK | 2/23/2012 | | 2/28/2012 | | PASS |
Carl Westfall
|
|
|
Deferred submittal letter received. Drawings approved.
|
Routing PW Drainage | 2/23/2012 | | 2/27/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 2/23/2012 | | 2/24/2012 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing Off Site - STRUCTURAL | 2/23/2012 | | 2/24/2012 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 2/3/2012 | | 2/14/2012 | | FAIL |
Carl Westfall
|
|
|
Waiting for owner's letter.
|
Routing Off Site - STRUCTURAL | 2/3/2012 | | 2/9/2012 | | FAIL |
Carl Westfall
|
|
|
Need revised calculations.
|
Routing PW Drainage | 2/3/2012 | | 2/7/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 2/3/2012 | | 2/7/2012 | | |
|
|
|
|
Route to Impact Fee Review | 1/4/2012 | | 2/3/2012 | | |
|
|
|
|
Routing PW Drainage | 1/4/2012 | | 2/2/2012 | | |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 1/4/2012 | | 1/26/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Jan 12 and finished on Jan 26. Revised drawings were required. See the plan review report. Sent a copy of the plan review (Word Document) to the Architect.
|
1st review completed | | | 1/26/2012 | | DONE |
|
|
|
|
Routing PW Environmental | 1/10/2012 | | 1/17/2012 | | |
Walt Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 1/4/2012 | | 1/13/2012 | | PASS |
Steven Webb
|
|
|
ESC plan is approved per ESC plan and ESC permit conditions.
|
Routing - Erosion and Sediment | 1/10/2012 | | 1/13/2012 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/10/2012 | | 1/12/2012 | | FAIL |
Carl Westfall
|
|
|
|
Routing - Design Review | 1/10/2012 | | 1/11/2012 | | |
|
|
|
|
Routing - PLUMBING | 1/4/2012 | | 1/11/2012 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - Addressing | 1/10/2012 | | 1/11/2012 | | PASS |
April Wing
|
|
|
|
Routing Off Site - STRUCTURAL | 1/4/2012 | | 1/10/2012 | | FAIL |
|
|
|
|
Routing - PLUMBING | 1/4/2012 | | 1/10/2012 | | FAIL |
Daryl Spivey
|
|
|
1) provide drainage information on overflow termination at grid 16-EE
2)provide secondary drainage systems for storm drains in rec yards-3 places.
3)use approved fittings at waste connection at grid 14-EE.
4) correct pipe sizing page M1.2 grid 13-CC
|
Routing - PUBLIC WORKS | 1/10/2012 | | 1/10/2012 | | |
|
|
|
|
Routing - PLANNING | 1/10/2012 | | 1/10/2012 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/10/2012 | | 1/10/2012 | | |
|
|
|
|
Routing PW Sewer Rating | 1/10/2012 | | 1/10/2012 | | |
|
|
|
|
Routing - FIRE | 1/10/2012 | | 1/10/2012 | | |
|
|
|
|
Route to Impact Fee Review | 1/4/2012 | 1/9/2012 | 1/6/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 1/4/2012 | | 1/6/2012 | | PASS |
April Wing
|
|
|
|
Routing - Erosion and Sediment | 1/4/2012 | | 1/6/2012 | | |
|
|
|
|
Routing PW Sewer Rating | 1/5/2012 | | 1/5/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - FIRE | | | 1/5/2012 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/4/2012 | | 1/4/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - FIRE | 1/4/2012 | | 1/4/2012 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal item to architect. Marked up Electronic plan.
|
Routing - PLANNING Land Div | 1/4/2012 | | 1/4/2012 | | PASS |
Dave Abo
|
|
|
Addition to existing building that was approved by previous building permits.
|
Telephone call | | | 1/4/2012 | | |
|
|
|
1-3-12 emailed Dave Logan that fees were due ///dld
|
Intake Approval | | | 1/4/2012 | | PASS |
Jason Blais
|
|
|
Sam Zahorka conducted intake.
|
Routing - PLANNING | 1/4/2012 | | 1/4/2012 | | PASS |
Joshua Johnson
|
|
|
Josh Johnson - CUP11-00069
|
Routing - Design Review | 1/4/2012 | | 1/4/2012 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH11-00223
|
Plan Reviewer's activity | | | 1/4/2012 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD for evaluation of any impact fees. Written verification from ACHD to be provided to our Permit Counter staff prior to the building permit being issued.
|
Application received | | | 12/27/2011 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 27 2011 4:30PM
|