(ADA COUNTY JAIL - POD D EXPANSION) The fire sprinkler system is required because this building is an I-3 Occupancy. To construct a 12,639 square foot prison (7,403 square foot 1st tier and 5,236 square foot 2nd tier). Work is to include concrete footings, concrete foundations, concrete slab on grade floor, masonry walls, elevated concrete floors, concrete columns, elevated concrete slab with steel pan deck, steel skin cell walls filled with concrete grout, stairways, steel bar joist roof, steel roof deck, roof insulation installed on top of the roof deck, skylights, and a membrane roof covering. The work is required to comply with the approved drawings, with the specifications, with the structural calculations, with the plan review report, and with all applicable codes and ordinances. Required Special Inspections include concrete, expansion bolts, epoxy anchors, masonry, high strength bolting, welding, structural steel, spray fire proofing, and soils. Some site work will also be done under this permit. The upper tier floor and support structure at the cells is a deferred submittal item. That work shall not be done until the structural design is reviewed and approved. See the letter signed by David Logan, Director of Ada County Operations. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/10/2013 DONE
DetailsChristina Prado
First Notice 9/9/201310/2/2013 DONE
DetailsChristina Prado
mailed 10-3-13
Permanent Occupancy  8/30/2013 DONE
DetailsTisha Gallop
BLD-Final6/6/20136/7/20136/7/2013PPASS
DetailsTom Arcoraci
Tom, the electrical inspector has signed off temp. and hopefully he will get here before you do. Otherwise all set. Phone #: ###-#### >> Inspection requested via web by Gary Simon
FIRE-Final Inspection6/6/20136/7/20136/7/2013APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection6/4/20136/6/20136/6/2013PFAIL
DetailsTroy Cobbley
Fire Life and safety can ve passed when the project related fire alarm and fire sprinkler permits have been addressed.
Zoning Approval5/9/20135/9/20135/9/2013 DONE
DetailsAndrea Tuning
BLD-Ceiling Grid Inspection4/10/20134/11/20134/11/2013APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Conference3/13/20133/13/20133/13/2013PCANC
DetailsTom Arcoraci
Tom, I had one more thing for you to look at. If you are close it will only take a few minutes. Just come to the gate and drive in. Thanks Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Framing/Rough-in3/12/20133/12/20133/12/2013PPASS
DetailsTom Arcoraci
Tom, I need a ceiling rough in inspection.

Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other2/11/20132/12/20132/12/2013APASS
DetailsTom Arcoraci
BLD-Other2/11/20132/11/20132/12/2013PPASS
DetailsTom Arcoraci
BLD-Ceiling Grid Inspection1/28/20131/29/20131/29/2013PPASS
DetailsTom Arcoraci
Tom, I need a ceiling inspection for fat grid.
Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Concrete1/10/20131/10/20131/11/2013PPASS
DetailsTom Arcoraci
rebar is in place for remaining mezz. slab. Strata will inspect and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Concrete1/3/20131/4/20131/4/2013PPASS
DetailsTom Arcoraci
Tom, we are placing concrete for the mezz. floor. Strata will be onsite for rebar inspection as well as concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Conference12/12/201212/12/201212/12/2012PPASS
DetailsJim Storey
Tom, I have got a couple of things I want you to take a look at. This should not take up much of your time. Thanks Phone #: ###-#### >> Inspection requested via web by Gary Simon stair head height ok at guard station access.
Routing - PLAN CHECK10/10/2012 10/17/2012 PASS
DetailsCarl Westfall
The Architect uploaded new sheets for the cell construction. The new drawings are identical to the ones uploaded by Carl Westfall except that the Project Structural Engineer had stamped them to show that he had reviewed them. Deferred submittals were apprved through ePlanReview.
PLANS/APPL TAKEN TO FRONT DESK  10/17/2012 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  10/17/2012 DONE
DetailsTisha Gallop
Per Carl Westfall no fees due for deferred submittals.
Routing - PLAN CHECK9/27/2012 10/3/2012 DONE
DetailsCarl Westfall
This is a deferred submittal review. Drawings were uploaded by the Plans Examiner for the Architect. Reviewed the deferred submittal. Asked Barb to start a plan modification work flow (even though it is not a plan mod).
BLD-Other9/26/20129/27/20129/27/2012PPASS
DetailsTom Arcoraci
Cmu inspection. 1:00pm Strata will be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
Plan resubmittals received  9/27/2012 DONE
Deferred submittal for the cells were submitted.
BLD-Other9/19/20129/20/20129/20/2012PPASS
DetailsTom Arcoraci
grout cmu at various hgts. at noon. Strata to inspect rebar and observe grouting. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Concrete9/19/20129/20/20129/20/2012APASS
DetailsTom Arcoraci
Place concrete slab for Alt. # 2 area. Strata to inspect rebar and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other9/13/20129/14/20129/14/2012PPASS
DetailsTom Arcoraci
Grouting cmu walls at 4, 8, and 12 feet. Strata will be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing9/6/20129/7/20129/7/2012PPASS
DetailsDave Hannah
Concrete for footings and stemwall for alternate# 2. Strata to inspect rebar and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other9/6/20129/7/20129/7/2012APASS
DetailsDave Hannah
Grout interior cmu walls @ 4''. Strata to inspect rebar. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Concrete8/27/20128/28/20128/28/2012APASS
DetailsTom Arcoraci
Tom, we are placing the concrete for the remaining slab tomorrow at 5:00am. Strata will look at the rebar mat, vapor barrier today and test the concrete tomorrow. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/21/20128/21/20128/21/2012PPASS
DetailsTom Arcoraci
Strata will be onsite for rebar inspection and concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Concrete8/16/20128/17/20128/17/2012APASS
DetailsTom Arcoraci
Inspect vapor barrier and rebar mat for slab.
Strata will inspect vapor and rebar today and test concrete monday am. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation8/8/20128/8/20128/8/2012PPASS
DetailsTom Arcoraci
Tom, we are pouring the 12" stemwalls on the ftgs. Strata will be onsite for rebar and concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/6/20128/7/20128/7/2012PPASS
DetailsTom Arcoraci
Tom,we are placing concrete in interior footings late afternoon. Strada will be onsite to inspect the rebar and test concrete. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation7/12/20127/16/20127/16/2012APASS
DetailsTom Arcoraci
We are pouring foundation walls starting at 6:00am Monday morning. Strata is doing all rebar inspections. if you would like you could come by tomorrow and look at everything its all set up now.


MB >> Inspection requested via web by Mike Burden
BLD-Footing7/9/20127/9/20127/9/2012PPASS
DetailsTom Arcoraci
We are planning on pouring at 2:00 PM you can call me on my cell when you get here and i will get you in it the far east entry there is a little guard shack outside the gate. Phone #: ###-#### >> Inspection requested via web by Mike Burden
Issue PAID IN FULL permit  6/6/2012 DONE
DetailsBarbara Stitt
Print Occupancy Form  6/6/2012 DONE
DetailsBarbara Stitt
Telephone call  6/5/2012 DONE
emailed gc fees due
Permit Ready to Issue  6/5/2012 DONE
Plan assigned to (CJW)3/22/20123/22/20124/20/2012 PASS
DetailsCarl Westfall
Routing - PLAN CHECK4/19/2012 4/20/2012 PASS
DetailsCarl Westfall
Finished plan processing.
PLANS/APPL TAKEN TO FRONT DESK  4/20/2012 DONE
Telephone call  4/20/2012 DONE
DetailsTisha Gallop
e-mailed Russel plans approved and have GC contact permit desk for issuance
Routing - PLAN CHECK4/11/2012 4/19/2012 PASS
DetailsCarl Westfall
Revised drawings were not uploaded until April 11. Reviewed all revised drawings.
Routing - PLUMBING4/19/2012 4/19/2012 PASS
DetailsBill VanDegrift
Verify changes between V1 to V3 to Sheets P1.0, P1.1, and P1.2 (actual numbers on sheets are M1.0, M1.1, and M1.2)
CHANGE STATUS TO (REV)  3/22/2012 DONE
Revised drawings being submitted in ePlanReview.
PLANS/APPL TAKEN TO FRONT DESK  2/28/2012 DONE
Plan assigned to (CJW)1/4/2012 2/28/2012 PASS
DetailsCarl Westfall
ADA COUNTY JAIL (20 days - Jan. 31) ePlanReview
Routing - PLAN CHECK2/23/2012 2/28/2012 PASS
DetailsCarl Westfall
Deferred submittal letter received. Drawings approved.
Routing PW Drainage2/23/2012 2/27/2012 PASS
DetailsBrian Murphy
Routing - PLUMBING2/23/2012 2/24/2012 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing Off Site - STRUCTURAL2/23/2012 2/24/2012 PASS
DetailsCarl Westfall
Routing - PLAN CHECK2/3/2012 2/14/2012 FAIL
DetailsCarl Westfall
Waiting for owner's letter.
Routing Off Site - STRUCTURAL2/3/2012 2/9/2012 FAIL
DetailsCarl Westfall
Need revised calculations.
Routing PW Drainage2/3/2012 2/7/2012 PASS
DetailsBrian Murphy
Routing - PLUMBING2/3/2012 2/7/2012  
Route to Impact Fee Review1/4/2012 2/3/2012  
Routing PW Drainage1/4/2012 2/2/2012  
DetailsBrian Murphy
Routing - PLAN CHECK1/4/2012 1/26/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on Jan 12 and finished on Jan 26. Revised drawings were required. See the plan review report. Sent a copy of the plan review (Word Document) to the Architect.
1st review completed  1/26/2012 DONE
Routing PW Environmental1/10/2012 1/17/2012  
DetailsWalt Baumgartner
Routing - Erosion and Sediment1/4/2012 1/13/2012 PASS
DetailsSteven Webb
ESC plan is approved per ESC plan and ESC permit conditions.
Routing - Erosion and Sediment1/10/2012 1/13/2012  
Routing Off Site - STRUCTURAL1/10/2012 1/12/2012 FAIL
DetailsCarl Westfall
Routing - Design Review1/10/2012 1/11/2012  
Routing - PLUMBING1/4/2012 1/11/2012 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - Addressing1/10/2012 1/11/2012 PASS
DetailsApril Wing
Routing Off Site - STRUCTURAL1/4/2012 1/10/2012 FAIL
Routing - PLUMBING1/4/2012 1/10/2012 FAIL
DetailsDaryl Spivey
1) provide drainage information on overflow termination at grid 16-EE
2)provide secondary drainage systems for storm drains in rec yards-3 places.
3)use approved fittings at waste connection at grid 14-EE.
4) correct pipe sizing page M1.2 grid 13-CC
Routing - PUBLIC WORKS1/10/2012 1/10/2012  
Routing - PLANNING1/10/2012 1/10/2012  
Routing - PLANNING Land Div1/10/2012 1/10/2012  
Routing PW Sewer Rating1/10/2012 1/10/2012  
Routing - FIRE1/10/2012 1/10/2012  
Route to Impact Fee Review1/4/20121/9/20121/6/2012 PASS
DetailsCindy M. Gould
Routing - Addressing1/4/2012 1/6/2012 PASS
DetailsApril Wing
Routing - Erosion and Sediment1/4/2012 1/6/2012  
Routing PW Sewer Rating1/5/2012 1/5/2012 PASS
DetailsConnie Baumgartner
Routing - FIRE  1/5/2012 PASS
Routing - PUBLIC WORKS1/4/2012 1/4/2012 PASS
DetailsBeverly Mountain
Routing - FIRE1/4/2012 1/4/2012 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal item to architect. Marked up Electronic plan.
Routing - PLANNING Land Div1/4/2012 1/4/2012 PASS
DetailsDave Abo
Addition to existing building that was approved by previous building permits.
Telephone call  1/4/2012  
1-3-12 emailed Dave Logan that fees were due ///dld
Intake Approval  1/4/2012 PASS
DetailsJason Blais
Sam Zahorka conducted intake.
Routing - PLANNING1/4/2012 1/4/2012 PASS
DetailsJoshua Johnson
Josh Johnson - CUP11-00069
Routing - Design Review1/4/2012 1/4/2012 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH11-00223
Plan Reviewer's activity  1/4/2012 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD for evaluation of any impact fees. Written verification from ACHD to be provided to our Permit Counter staff prior to the building permit being issued.
Application received  12/27/2011 DONE
Application submitted via PDS Online on Dec 27 2011 4:30PM