Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD11-03036
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 350 N MILWAUKEE ST Unit: 2128
Project NameBTS - #2128 CHAMPS
Customer Number 
ePlanReviewNo
Description
(CHAMPS / Foot Locker - BOISE TOWNE SQUARE - SPACE # 2128) PLAN MODIFICATION 3-28-12 – Modification submitted to change smoke control design by adding additional transfer grilles.**TLW** To remodel an existing 4,505 square foot retail store by combining it with one small tenant space and part of the mall common area increasing this tenant space to 5,950 square feet. Work to include: [installation of interior non-bearing partition walls to create: [a stockroom, a sales area, unisex accessible restroom, fitting rooms, accessible fitting room, and a hallway], installation of new flooring throughout, construction of a new storefront area, installation of suspended ceiling system per CISCA 0-2, new lighting, revise mechanical ducting only, new plumbing, and interior finishes in compliance with ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks (Racking permit attached to this permit/plans under case number BLD11-03037). NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/26/20126/7/2012 DONE
DetailsBarbara Stitt
First Notice 4/21/20125/16/2012 DONE
faxed 5-16-12
BLD-Final4/10/20124/11/20124/11/2012PPASS
DetailsMike Jordan
TONY Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  4/11/2012 DONE
DetailsChristina Prado
FIRE-Final Inspection4/5/20124/6/20124/9/2012PDONE
DetailsForrest France
BLD-Final4/6/20124/9/20124/9/2012PPART
DetailsTom Arcoraci
Tony Phone #: ###-#### ok for temp occ
FIRE-Final Inspection4/6/20124/9/20124/9/2012PPASS
DetailsTroy Cobbley
life safety passed
Temporary Occupancy4/9/20127/8/20124/9/2012 DONE
DetailsTisha Gallop
BLD-Final4/5/20124/6/20124/6/2012PFAIL
DetailsMike Jordan
Tony Phone #: ###-####. Provide ADA compliant hardware at changing room, Install all racking as per approved plans. Also Needs life/safety.
FIRE-Conference4/2/20124/2/20124/2/2012PDONE
DetailsTroy Cobbley
I found a roof penatration (3'x3') that has been blocked off. This penatration is not shown on the city approved plans. I requested a responce from the engineer, who designed changes to the smoke evac system for this project, too provide verification that the smoke evac. system is not effected by blocking this penatration.
Plan assigned to (TLW)3/20/2012 3/28/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/20/2012 3/28/2012 PASS
DetailsTim L. Woodard
Case Summary (BLD)  3/28/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  3/28/2012 DONE
Telephone call  3/28/2012 DONE
DetailsTisha Gallop
called Jeff Langan and left vm plan mod is ready and fees.
CHANGE STATUS TO (ISS)  3/28/2012 DONE
DetailsTisha Gallop
picked up and paid for approved plan mod
Plan Modification Accepted  3/20/2012 DONE
DetailsTisha Gallop
Plan Modification accepted for Bld11-03036 (Champs) to modify smoke evac given existing conditions exposed following demolition; submitted on plan sheets G1.0, M1.0, M2.0; routed to Tim Woodard.
BLD-Other3/15/20123/16/20123/19/2012PPASS
DetailsJim Sly
Ceiling Cover-- Tony Phone #: ###-####
Framing at walls and ceiling OK.
Telephone call  2/28/2012 DONE
DetailsTisha Gallop
called Kent Fahey and told him permit is ready, fees, and need GC to sign form and provide RCE#.
Issue PAID IN FULL permit  2/28/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK1/26/2012 2/27/2012 PASS
DetailsTim L. Woodard
Approved with Resubmittals and Mall submitted plan BLD12-00359. TLW
Plan assigned to (TLW)1/10/2012 2/27/2012 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/27/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/27/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  2/27/2012 DONE
Permit Ready to Issue  2/27/2012 DONE
DetailsTisha Gallop
Plan resubmittals received  2/14/2012 DONE
DetailsTisha Gallop
By mail received response from Architect and two copies of plan sheets G1.0, D1.0, D2.0, A1.3, A2.0a, A2.0b, A2.0c, A2.1, A2.2, A3.0, A5.0, A6.0, M1.0, M2.0, E2.0; taken to Tim Woodard.
Routing - FIRE1/24/2012 1/26/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  1/26/2012 FAIL
Failed Plan Check
Routing - PLAN CHECK1/11/2012 1/24/2012 FAIL
DetailsTim L. Woodard
Refer to attached report. TLW
Routing PW Sewer Rating1/10/2012 1/11/2012 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS1/10/2012 1/11/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing1/10/2012 1/10/2012 PASS
DetailsTerry Records
Plans ACCEPTED BY PLAN TECH  1/10/2012 DONE
DetailsBarbara Stitt
Pending Assignment by JCB1/10/2012 1/10/2012 DONE
DetailsJason Blais
Intake Approval  1/10/2012 PASS
Plan resubmittals received  1/9/2012 DONE
DetailsChristina Prado
Received two sets of app 310; form 304 and 2copies of mechanical compliance certificate. Given to Carl Westfall for review
Intake Approval  12/30/2011 FAIL
DetailsCarl Westfall
Application received 12/29/201112/29/2011 DONE
DetailsBarbara Stitt