First Notice | | 6/24/2012 | 6/15/2012 | | DONE |
|
|
|
This permit finaled on the web by John Binfet
|
Permanent Occupancy | | | 6/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 6/12/2012 | 6/13/2012 | 6/13/2012 | A | PASS |
Troy Cobbley
|
|
|
No parking signs installed via ACHD. Life safety passed
|
BLD-Final | 6/13/2012 | 6/13/2012 | 6/13/2012 | A | PASS |
Tom Arcoraci
|
|
|
ok for c/o
|
FIRE-Final Inspection | 5/30/2012 | 5/31/2012 | 5/31/2012 | A | PART |
Forrest France
|
|
|
Final pending installation of two "no parking" signs. T.O. approval okayed per R. Gervais.
|
BLD-Final | 5/30/2012 | 5/31/2012 | 5/31/2012 | P | CANC |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
FIRE-Final Inspection | 5/29/2012 | 5/30/2012 | 5/30/2012 | A | FAIL |
Troy Cobbley
|
|
|
The required street width as approved by the fire dept. has not been met. Romeo Gervais has been notified and has requested information from the engineer prior to a sign off on this permit. All other items are ok.
|
BLD-Final | 5/29/2012 | 5/30/2012 | 5/30/2012 | P | PASS |
Tom Arcoraci
|
|
|
JOHN Phone #: ###-#### pending fire inspection
|
Zoning Approval | 5/23/2012 | 5/23/2012 | 5/23/2012 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Conference | 4/2/2012 | 4/2/2012 | 4/2/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 2/16/2012 | 2/16/2012 | 2/16/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ready for final framing inspection on 413 S. Orchard. Thanks. Phone #: ###-#### >> Inspection requested via web by John Binfet
|
BLD-Footing | 2/7/2012 | 2/8/2012 | 2/8/2012 | P | PASS |
Tom Arcoraci
|
|
|
todd Phone #: ###-####
|
Plan assigned to (CJW) | 1/5/2012 | 1/5/2012 | 2/6/2012 | | PASS |
Carl Westfall
|
|
|
SOUTHWORTH ASSOCIATES (20 days - Feb 1)
|
Routing - PLAN CHECK | 1/31/2012 | | 2/6/2012 | | DONE |
Carl Westfall
|
|
|
Out of town for training. Fire processed quicker than expected. Issuance delayed until return from training.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/6/2012 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2012 | | DONE |
Christina Prado
|
|
|
Called and gave John fees due. Advised ACHD is required prior to issuance.
|
Permit Ready to Issue | | | 2/6/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 2/6/2012 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/30/2012 | 2/2/2012 | 1/31/2012 | | PASS |
Cindy M. Gould
|
|
|
No impact fees. Fees for commercial use are lower than the fees for residential. No refunding allowed.
|
Routing - FIRE | 1/30/2012 | 1/30/2012 | 1/31/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 1/31/2012 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/10/2012 | | 1/30/2012 | | PASS |
Carl Westfall
|
|
|
The IBC plan review was started on Jan 27 and was finished on Jan 30. The drawings were approved with "red lines". See the plan review report.
|
Routing - PLANNING | 1/10/2012 | | 1/10/2012 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Design Review | 1/10/2012 | | 1/10/2012 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH11-00251
|
Routing - Erosion and Sediment | 1/9/2012 | | 1/10/2012 | | PASS |
Clint A Smith
|
|
|
Existing permit under ESC11-00806.
|
Routing PW Sewer Rating | 1/6/2012 | | 1/9/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 1/6/2012 | | 1/9/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/5/2012 | | 1/6/2012 | | PASS |
Terry Records
|
|
|
|
Application received | | 1/3/2012 | 1/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCB | 1/5/2012 | | 1/5/2012 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/5/2012 | | PASS |
Jason Blais
|
|
|
Intake done by Carl Madsen.
|
Intake Approval | | | 1/3/2012 | | FAIL |
|
|
|
|