Third Notice | | 7/10/2012 | 1/3/2013 | | DONE |
|
|
|
|
Second Notice | | 6/16/2012 | 7/5/2012 | | DONE |
|
|
|
|
First Notice | 5/21/2012 | 5/21/2012 | 6/6/2012 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 5/18/2012 | 5/21/2012 | 5/21/2012 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 5/16/2012 | 5/18/2012 | 5/18/2012 | A | PASS |
Jim Storey
|
|
|
Final Inspection for NH3 pad Phone #: ###-#### >> Inspection requested via web by Frederick Sand
|
BLD-Final | 5/8/2012 | 5/11/2012 | 5/10/2012 | A | CANC |
Jim Storey
|
|
|
Project C16143 Install Bulk NH3 System Phone #: ###-#### >> Inspection requested via web by Frederick Sand Inspection cancelled from web by: Frederick Sand
|
FIRE-Final Inspection | 5/3/2012 | 5/7/2012 | 5/8/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Inspection Record Card- Bld | | | 5/7/2012 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 4/26/2012 | 4/26/2012 | 4/26/2012 | P | CANC |
Troy Cobbley
|
|
|
Life safety Final Phone #: ###-#### >> Inspection requested via web by Wayne Berry
|
Routing - FIRE | 4/12/2012 | 4/23/2012 | 4/25/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (JCM) | 4/12/2012 | | 4/25/2012 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 4/12/2012 | | 4/25/2012 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/25/2012 | | PASS |
John Menard
|
|
|
Reviewed and approved structural and nonstructural requirements. JCM
|
Issue PAID IN FULL permit | | | 4/25/2012 | | DONE |
|
|
|
|
1st review completed | | | 4/25/2012 | | PASS |
John Menard
|
|
|
|
Route to Impact Fee Review | 4/12/2012 | 4/17/2012 | 4/12/2012 | | PASS |
Cindy M. Gould
|
|
|
No impact fees
|
Pending Assignment by JCM | 4/12/2012 | | 4/12/2012 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 4/10/2012 | | PASS |
John Menard
|
|
|
|
Intake Approval | | | 4/4/2012 | | FAIL |
John Menard
|
|
|
Please Submit the following items:
1. Please submit Statement of Special Inspection Form #310, completed and stamped by the project structural engineer.
2. Please submit structural calculations for all proposed bolted and welded connections.
3. Please resubmit the electrical plans, oriented horizontally and not vertically.
|
Intake Approval | | | 3/7/2012 | | FAIL |
John Menard
|
|
|
Please Submit the following items:
1. Please submit a copy of the soils report used for the foundation design.
2. Please submit Statement of Special Inspection Form #310, completed and stamped by the
project structural engineer. Also, if not included on one of the missing structural sheets,
please add all required specials inspections to the structural plans.
3. Please submit structural calculations for all proposed bolted and welded connections.
4. Please submit the steel structural plans, it doesn't appears structural sheets S-01 - S-05 were uploaded.
5. Please submit the electrical plans indicated on the plan intake list.
|
Application received | | | 1/9/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 9 2012 2:43PM
|