DOC - Permit Expired | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Jim Storey
|
|
|
|
Case Summary (BLD) | | | 10/17/2014 | | DONE |
|
|
|
|
BLD-Final | 1/25/2012 | 1/31/2012 | 1/31/2012 | P | NR |
Jim Storey
|
|
|
nate Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2012 | 1/31/2012 | 1/31/2012 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit signs, provide emergency lighting in the Display area, remove hardware from the northwest store front door, provide racking permit for the storage racks that exceed 8' (racks are 12'), provide high pile storage permit, it appears that pendant sprinklers are overspaced in two locations in the Display area (product is 15' piled, 19' on the racks).
|
Issue PAID IN FULL permit | | | 1/25/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/10/2012 | | 1/17/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/10/2012 | | 1/17/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 1/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 1/17/2012 | | DONE |
|
|
|
t/c w mike - permit ready
|
Print Occupancy Form | | | 1/17/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/17/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/10/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/10/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 1/10/2012 | | | |
|
|
|
|