Third Notice | | 5/31/2012 | 5/18/2012 | | DONE |
|
|
|
|
Second Notice | | 4/27/2012 | 5/17/2012 | | DONE |
|
|
|
faxed to GC
|
First Notice | | 4/9/2012 | 4/17/2012 | | DONE |
|
|
|
faxed
|
BLD-Final | 3/29/2012 | 3/30/2012 | 3/30/2012 | A | PASS |
Mike Jordan
|
|
|
Please call before arrival on site. Thanks. Phone #: ###-#### >> Inspection requested via web by Philip Allen. Ok for perm occ.
|
Permanent Occupancy | | | 3/30/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 3/29/2012 | 3/29/2012 | 3/29/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 3/26/2012 | 3/29/2012 | 3/29/2012 | A | NR |
Mike Jordan
|
|
|
Please call before arriving on site. Thanks! Phone #: ###-#### >> Inspection requested via web by Philip Allen. Life/safety failed.
|
FIRE-Final Inspection | 3/26/2012 | 3/29/2012 | 3/29/2012 | A | FAIL |
Troy Cobbley
|
|
|
The two exit signs failed to operate on backup power. All other items are ok.
|
BLD-Other | 3/16/2012 | 3/19/2012 | 3/19/2012 | A | PASS |
Mike Jordan
|
|
|
Seismic/ Ceiling grid. Please call before arriving to job site. Thanks. Phone #: ###-#### >> Inspection requested via web by Philip Allen
|
BLD-Other | 3/14/2012 | 3/15/2012 | 3/15/2012 | A | NR |
Mike Jordan
|
|
|
Seismic Inspection for Ceiling Grid. Please call before inspection. Thanks. Phone #: ###-#### >> Inspection requested via web by Philip Allen
|
BLD-Framing/Rough-in | 3/1/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Mike Jordan
|
|
|
Framing for new demising wall. Please call when on site. Thanks! Phone #: ###-#### >> Inspection requested via web by Philip Allen. Interior steel stud wall for new stockroom ok.
|
BLD-Wall cover | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | CANC |
Mike Jordan
|
|
|
Electrical Rough in for wall cover. Phone #: ###-#### >> Inspection requested via web by Philip Allen
|
BLD-Framing/Rough-in | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | CANC |
Mike Jordan
|
|
|
Framing inspection for new demising wall. Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|
Issue PAID IN FULL permit | | | 2/23/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/12/2012 | | 1/18/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 1/17/2012 | | 1/18/2012 | | PASS |
Tim Frost
|
|
|
|
1st review completed | | | 1/18/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/18/2012 | | 1/18/2012 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/18/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/18/2012 | | DONE |
|
|
|
|
Telephone call | | | 1/18/2012 | | DONE |
Christina Prado
|
|
|
Called and left message with Bill Beebe giving fees due and advising GC/RCE is required prior to issuance
|
Override - Parcel Holds | | | 1/18/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 1/18/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 1/12/2012 | | 1/17/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines and plan review report. TLW
|
Plans ACCEPTED BY PLAN TECH | | | 1/12/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/12/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Override - Parcel Holds | | | 1/12/2012 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/12/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 1/10/2012 | | | |
|
|
|
|