Second Notice | | 3/16/2014 | 4/1/2014 | | DONE |
|
|
|
|
First Notice | 1/14/2014 | 1/14/2014 | 3/6/2014 | | DONE |
Jim Sly
|
|
|
retuned mail form owner/GC "temporarily away" for the last several months on other projects in this same plaza by same person. Left couple of vm but no return calls.
|
BLD-Final | 1/14/2014 | 1/14/2014 | 1/14/2014 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 5/11/2012 | 5/14/2012 | 5/14/2012 | A | PASS |
Jim Sly
|
|
|
bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/1/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/27/2012 | | DONE |
Tisha Gallop
|
|
|
called Bill Matter Arch. and told Liz that permit is ready and fees.
|
Plan Reviewer's activity | | | 2/24/2012 | | DONE |
Jason Blais
|
|
|
Bond posted under case BND12-00006.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2012 | | DONE |
Jason Blais
|
|
|
|
Routing - PLAN CHECK | 1/31/2012 | | 2/24/2012 | | PASS |
Jason Blais
|
|
|
Bond on Upgrade Agreement posted. Plans approved by Dan Stuart.
|
Plan assigned to (DRS) | 1/11/2012 | | 2/24/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing Off Site - STRUCTURAL | 2/2/2012 | | 2/6/2012 | | PASS |
Dan Stuart
|
|
|
Received e-mail approving structural plan review by our engineering consultant.
|
Telephone call | | | 2/2/2012 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 2/1/2012 | | DONE |
Tisha Gallop
|
|
|
received four copies of response, structural calcs and plan sheets A2, A3, A4; taken to Dan Stuart.
|
Routing - FIRE | 1/27/2012 | | 1/31/2012 | | PASS |
Scott Arellano
|
|
|
No comments are attached to plans. A fire sprinkler permit will be required to protect the new combustible canopy. The fire sprinkler design and installation shall be in accordance with NPFA 13 and the building upgrade agreement on file. A seperate fire sprinkler permit will be required.
|
1st review completed | | | 1/31/2012 | | FAIL |
|
|
|
Failed Structural and Plan Check
|
Plan Reviewer's activity | | | 1/27/2012 | | DONE |
Dan Stuart
|
|
|
Copy of plan review e-mailed to architect, Bill Matter. Cover letter to which plan review is attached explains that the permit cannot be issued until the required bond per the Upgrade Agreement of 11/30/09 has been provided and accepted by PDS Plan Review.
|
Routing - PLAN CHECK | 1/18/2012 | | 1/27/2012 | | FAIL |
Dan Stuart
|
|
|
Failed structural review. Also issue of permit is tied to Library Plaza (Evergreen Plaza) (Business Mall) owner posting bond as required per Alternate / Upgrade Agreement on file. copy attached to this permit.Routing to fire code analyst for review.
|
Plan resubmittals requested | | | 1/26/2012 | | DONE |
|
|
|
Copy of structural plan review e-mailed to architect for resubmittal correction response.
|
Routing Off Site - STRUCTURAL | 1/11/2012 | | 1/26/2012 | | FAIL |
Dan Stuart
|
|
|
Called Action Courier for pick up at 3:00pm//BAS
1-26-12 Received e-mail copy of structural engineering plan review. Review failed copy of report e-mailed to Bill Matter, Architect and copy attached to BLD12-00067.
|
Routing - PLUMBING | 1/17/2012 | | 1/18/2012 | | PASS |
Daryl Spivey
|
|
|
No plumbing.
|
Routing - PLANNING | 1/18/2012 | | 1/18/2012 | | PASS |
Josh Wilson
|
|
|
CZC11-00252-Josh Wilson
|
Routing - Erosion and Sediment | 1/13/2012 | | 1/17/2012 | | CANC |
Clint A Smith
|
|
|
Due to the size of the project, No permit is required but must still follow the BMC8-17 Construction site Erosion and Sediment Control Ord.
|
Routing - Addressing | 1/13/2012 | | 1/13/2012 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 1/13/2012 | | 1/13/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 1/11/2012 | | 1/13/2012 | | PASS |
Todd Tucker
|
|
|
Parcel was created by ROS09-00004.
|
Routing - PUBLIC WORKS | 1/13/2012 | | 1/13/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 1/11/2012 | 1/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Pending Assignment by JCM | 1/11/2012 | | 1/11/2012 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 1/11/2012 | | PASS |
John Menard
|
|
|
|