Second Notice | | 6/15/2012 | 7/3/2012 | | |
Barbara Stitt
|
|
|
Mailed 7-2-12
|
First Notice | | 3/19/2012 | 3/30/2012 | | DONE |
|
|
|
|
BLD-Final | 3/9/2012 | 3/9/2012 | 3/9/2012 | P | PASS |
Jim Sly
|
|
|
Bruce Poe Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 3/8/2012 | 3/9/2012 | 3/9/2012 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety passed
|
Permanent Occupancy | | | 3/9/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 3/9/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/9/2012 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/8/2012 | 3/8/2012 | 3/8/2012 | P | FAIL |
Troy Cobbley
|
|
|
Could not perform inspection due to the approved plans not being on site. I did go over the general life safety requirements with the business owner such as door hardware and the placement of the fire extinguisher. The inspection has been rescheduled for tomorrow morning.
|
BLD-Final | 2/2/2012 | 2/6/2012 | 2/6/2012 | A | CANC |
Dave Hannah
|
|
|
Keith Phone #: ###-#### needs fire finals first
|
FIRE-Conference | 1/24/2012 | 1/25/2012 | 1/25/2012 | A | DONE |
Forrest France
|
|
|
On site visit regarding existing fire sprinkler coverage and guidelines per NFPA 13 2010 table 8.6.5.2.2. Noted overspaced sprinklers adjacent to an existing wall.
|
BLD-Framing/Rough-in | 1/23/2012 | 1/23/2012 | 1/24/2012 | P | PASS |
Dave Hannah
|
|
|
keith Phone #: ###-####
|
Print Occupancy Form | | | 1/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 1/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (RDY) | | | 1/19/2012 | | DONE |
|
|
|
hadn't paid permit fees
|
CHANGE STATUS TO (ISS) | | | 1/19/2012 | | DONE |
Christina Prado
|
|
|
fees paid
|
Permit Ready to Issue | | | 1/18/2012 | | DONE |
Rita DeYoung
|
|
|
Plan have been batched stamp. New contractor to provide new cert. of value,RCE\T # and pay fees before permit will be issued.
|
Plan assigned to (TLW) | 1/13/2012 | | 1/17/2012 | | PASS |
Tim L. Woodard
|
|
|
ePlanReview - Level 1
|
Routing - PLAN CHECK | 1/13/2012 | | 1/17/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Rating | 1/17/2012 | | 1/17/2012 | | PASS |
Connie Baumgartner
|
|
|
|
1st review completed | | | 1/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Issue PAID IN FULL permit | | | 1/13/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
CHANGE STATUS TO (REV) | | | 1/13/2012 | | DONE |
Barbara Stitt
|
|
|
Was changed to issue status by govolutions and I changed to Rev satus per Jim Toombs//1-13-12 BAS
|
Intake Approval | | | 1/13/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Telephone call | | | 1/13/2012 | | DONE |
Barbara Stitt
|
|
|
Sent e-mail telling them plan intake fees due on 1-13-12 @ 2:50pm//BAS
|
Routing - PUBLIC WORKS | 1/13/2012 | | 1/13/2012 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | | 1/12/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 12 2012 10:26AM
|