Third Notice | | 4/28/2013 | 7/22/2013 | | DONE |
|
|
|
|
Third Notice | | 2/24/2013 | 4/23/2013 | | DONE |
|
|
|
mailed
|
Second Notice | | 2/7/2013 | 2/19/2013 | | DONE |
|
|
|
mailed 2-19-13
|
First Notice | 1/3/2013 | 1/3/2013 | 1/28/2013 | | DONE |
Tony Young
|
|
|
|
BLD-Final | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | DONE |
Tony Young
|
|
|
Rob--Please call for access information Phone #: ###-####
|
DOC - Permit Finaled | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 1/2/2013 | 1/2/2013 | 1/3/2013 | P | DONE |
Tony Young
|
|
|
Rob--Please call for access information Phone #: ###-####
|
FIRE-Final Inspection | 12/24/2012 | 12/24/2012 | 12/24/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety completed satisfactory. Project related fire alarm permit finaled.
|
(F) Reprint permit | | | 10/5/2012 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 | P | FAIL |
Troy Cobbley
|
|
|
A fire alarm permit is required for the new and relocated devices (smoke and heat detectors, electrical shunt trip) and their interconnection with the existing fire alarm system. It appears that fire alarm work has already been performed since the elevator recall devices have been relocated to the new mechanical closet and new cover plates installed in the previous locations. Activation of the new fire/smoke damper needs to be addressed as well and its interconnection with the fire alarm system. The permit requirement applies to all four buildings and related building permits BLD12-00090, 91, 92 & 93. Also the emergency lighting at the 2460 address did not function when tested in the first floor lobby. Fire extinguishers appear ok.
|
Third Notice | | 8/29/2012 | 9/6/2012 | | DONE |
|
|
|
reopened permit
|
Reopen Permit (ISS) | | | 9/6/2012 | | DONE |
Tisha Gallop
|
|
|
still need fire l/s insp
|
Second Notice | | 8/6/2012 | 8/24/2012 | | DONE |
|
|
|
|
First Notice | 7/24/2012 | 7/24/2012 | 7/27/2012 | | DONE |
Tony Young
|
|
|
|
BLD-Final | 7/23/2012 | 7/24/2012 | 7/24/2012 | P | PASS |
Tony Young
|
|
|
rob Phone #: ###-####
|
DOC - Permit Finaled | 7/24/2012 | 7/24/2012 | 7/24/2012 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 7/23/2012 | 7/23/2012 | 7/23/2012 | P | PASS |
Tony Young
|
|
|
rob Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/2/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (PEP) | 2/29/2012 | 2/29/2012 | 2/29/2012 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (CDM) | 2/21/2012 | 2/21/2012 | 2/29/2012 | | DEFR |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 2/29/2012 | | |
|
|
|
|
Routing - PLAN CHECK | 2/21/2012 | | 2/29/2012 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/29/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/29/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/29/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/29/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/29/2012 | | DONE |
Tisha Gallop
|
|
|
called Rob Mairs and told him permit is ready, fees, and need GC form.
|
Application received | | 1/13/2012 | 2/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (REV) | | | 2/17/2012 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/17/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/17/2012 | | DONE |
Tisha Gallop
|
|
|
|
VOIDED CHANGE STATUS | | | 1/24/2012 | | DONE |
|
|
|
|