Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-00103
StatusVoid/No Violation
Name GREEN REMODELING LLC
Site Address 1520 N 13TH ST
Project Name13th Street Pub and Grill
Customer Number 
ePlanReviewNo
Description
13th Street Pub and Grill (Kitchen Addition) - To construct a new 250 square foot kitchen addition on the second floor of an existing restaurant and office building. The kitchen addition is located on the southeast corner of a portion of the existing exterior east deck. The addition will contain a gas charbroiler grill and a gas griddle. There will be a Type I hood over the cooking appliances. The new addition will be accessed from the existing exterior deck stairway. All construction per the approved plans and attached comment list. A separate cooking hood fire suppression system permit will be required; as regulated by the Fire Department. A separate cooking hood fire suppression system permit will be required; as regulated by the Fire Department. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference4/21/20154/22/20154/22/2015PDEFR
DetailsJim Storey
Complaint of upstairs kitchen/prep area remodel without applicable permits. no violations observed..
VOIDED CHANGE STATUS  7/11/2012 DONE
DetailsChristina Prado
Per Jon w/Green remodeling, this project will not move forward. Permit Voided and fees taken out of system
Expiration Notice6/27/20127/19/20126/27/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK2/7/2012 2/24/2012 PASS
DetailsJohn Menard
Plan Reviewer's activity  2/24/2012 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  2/24/2012 DONE
DetailsJohn Menard
Print Occupancy Form  2/24/2012 DONE
Telephone call  2/24/2012 DONE
DetailsChristina Prado
Called and gave Richard fees due and advised ACHD Letter is required prior to issuance
Permit Ready to Issue  2/24/2012 DONE
DetailsChristina Prado
Plan assigned to (JCM)1/19/2012 2/24/2012 PASS
DetailsJohn Menard
Plan resubmittals received  2/21/2012  
Received 2 copies of structural caluculations, 2 copies of sheets CS, A-1, A-2, A-3, A-4, S-1S-2, M1.0, M2.0
Route to Impact Fee Review2/3/20122/8/20122/14/2012 PASS
DetailsCindy M. Gould
Routing - FIRE2/3/20122/3/20122/7/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/7/2012 FAIL
Failed Plan Check & Structural
Plan resubmittals requested  2/3/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK2/2/2012 2/3/2012 FAIL
DetailsJohn Menard
Routing - PLUMBING2/1/2012 2/2/2012 PASS
DetailsDaryl Spivey
Per 2003 UPC.
May require addition of dcva on main water service.
Tempered water required at lavatories and new hand wash sink.
Routing - PLANNING1/24/2012 2/1/2012 PASS
DetailsMatthew A Halitsky
Route to plumbing.
Plan resubmittals requested  1/27/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL1/19/2012 1/27/2012 FAIL
DetailsJohn Menard
Called Action Couriers for pick up on 1-19-12 @ 1:25pm//BAS
Received comment letter from consulting structural engieer requesting revisions. JCM
Routing - PUBLIC WORKS1/23/2012 1/24/2012 PASS
DetailsConnie Baumgartner
Routing PW Environmental1/24/2012 1/24/2012 PASS
DetailsWalt Baumgartner
Reviewed, existing GI ok
Routing PW Sewer Rating1/24/2012 1/24/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing1/23/2012 1/23/2012 PASS
DetailsApril Wing
Plan routing begun/NEW & ADDTN  1/20/2012 DONE
Routing - PLANNING Land Div1/20/2012 1/20/2012 PASS
DetailsDave Abo
Lots 6-8, Block 1 of Hyde Park Addition.
Intake Approval  1/19/2012 PASS
Pending Assignment by JCM1/19/2012 1/19/2012 DONE
DetailsJohn Menard
Application received 1/19/2012