BLD-Final | 1/30/2012 | 1/30/2012 | 1/30/2012 | P | PASS |
Mike Jordan
|
|
|
raejean Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 1/30/2012 | 1/30/2012 | 1/30/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 1/30/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/27/2012 | 1/27/2012 | 1/27/2012 | P | NR |
Mike Jordan
|
|
|
DAN Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 1/27/2012 | 1/27/2012 | 1/27/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware for the two exterior exit doors from the shop area and remove the sliding deadbolts. Remove the stairs or provide plan modifications addressing the stairs and lack of railings. Provide fire extinguishers as discussed. Provide electrical outlet covers. I also discussed potential issues with paint booths and high piled storage with the owners.
|
Issue PAID IN FULL permit | | | 1/27/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/23/2012 | | 1/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/23/2012 | | 1/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 1/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/26/2012 | | DONE |
|
|
|
|
Telephone call | | | 1/26/2012 | | DONE |
|
|
|
left vm for raejean - permit ready
|
Permit Ready to Issue | | | 1/26/2012 | | DONE |
|
|
|
|
Application received | | 1/23/2012 | 1/23/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/23/2012 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 2/9/2012 | | | |
|
|
|
|